The Northeast Ohio Regional Sewer District (NEORSD) is soliciting sealed bids for the Sheldon Road Profile Raising & Bridge Replacement Project, which will replace a deteriorated box culvert with a 60‑ft prestressed concrete box‑beam bridge and raise a 1,060‑ft section of Sheldon Road to mitigate flooding. The work includes demolition, excavation, bridge and roadway construction, utility relocation, storm‑water management, sidewalks, lighting, traffic control, and associated environmental mitigation. The contract’s estimated construction cost is $7.081 million, with a mandatory completion date of June 8 2028 (approximately 570 days from anticipated NTP). Bids must be submitted electronically via NEORSD’s OpenGov portal by September 16 2026, 1:00 pm. A non‑mandatory pre‑bid conference will be held on August 27 2026.
• Scope: demolition of existing bridge/culvert, construction of new prestressed concrete bridge, roadway raising, sidewalks, lighting, utility work, erosion control, and landscaping.
• Location: Sheldon Road, on the border of Brook Park and Middleburg Heights, Cuyahoga County, Ohio.
• Estimated Cost: $7.081 M (plus allowances).
• Schedule: Bid release 8/18/26 → Pre‑bid 8/27/26 → Questions due 9/4/26 → Bid deadline 9/16/26 → Construction completion by 6/8/28.
• Requirements: electronic bid submission, bid guaranty, performance/payment bonds, compliance with Davis‑Bacon, SBE goals (20 % SBE), various certifications and 72‑hour post‑award documents.
• Award: No specific award date disclosed; contract will be awarded after bid opening.