Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Information Technology RFPsInformation Technology and Software Development Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More IT services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›IT Services
  5. ›26-010 SCADA System Equipment Upgrade for Water System

Georgia City of Flowery Branch·Georgia

26-010 SCADA System Equipment Upgrade for Water System

Closes 6/30/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Flowery Branch is soliciting proposals from qualified Supervisory Control and Data Acquisition (SCADA) Integrators to provide both ongoing/as-needed SCADA maintenance and advisory services, and to perform capital improvements on/for the City’s existing SCADA system. The project includes the City’s SCADA monitoring and control system at one office location, with Remote Telemetry Units (RTUs) at one booster pump station, two elevated tank sites, and one well house site. The selected Integrator will be required to coordinate all SCADA system design, installation, and configuration with the City’s Information Technology (IT) Department to ensure network security, proper firewall configuration, and secure remote access in accordance with industry cybersecurity best practices. Key aspects of the project include: • SCADA system maintenance and advisory services • Capital improvements to the existing SCADA system • Coordination with the City’s IT Department for network security and configuration • Compliance with Georgia Environmental Finance Authority (GEFA) requirements • Adherence to applicable State and Federal laws and regulations

Attached files

Contact

Nancy Rodriguez(Buyer Contact/Finance Department Correspondent)

[email protected]

(770) 967-6371 ext 111

Key dates

Opened
5/13/2026
Pre-bid meeting
6/3/2026Mandatory
Site visit
6/3/2026Mandatory
Closes
6/30/2026

Last updated

Details

Type
Request for Proposal
Industry
Information Technology and Software Development
NAICS
541512
Solicitation №
26-010

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work and the fact that it is funded by the Georgia Environmental Finance Authority (GEFA). A reasonable estimate for the budget could be between $200,000 and $500,000, considering the costs of SCADA system design, installation, configuration, and maintenance, as well as the potential for additional services and capital improvements. Factors that may influence the likely payment range include the complexity of the SCADA system, the number of locations involved, and the level of expertise required for the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia City of Carrollton·Georgia

Top match · 70%

WTP SCADA and Filter Control System Improvements

Closes 12/3/2026Opened 10/29/2026

City of Lauderhill·Florida

69% match

REPLACEMENT OF THE EXISTING SCADA RADIO COMMUNICATION SYSTEM

Closes 11/16/2026Opened 10/23/2026

U.S. Department Of Health And Human Services·Arizona

68% match

SRSU - Water System Installation and Upgrade

Closes 2/17/2029Opened 2/10/2026

New York City Department of Environmental Protection·New York

67% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026

St. Johns County - Purchasing Department·Florida

67% match

Supervisory Control and Data Acquisitions (SCADA) Integration Services

Closes 11/12/2026Opened 9/24/2026

Contra Costa Water District·California

66% match

City of Brentwood Water Treatment Plant Actuator and Control System Upgrades

Closes 11/10/2026Opened 10/1/2026

City of Vallejo·California

66% match

Fleming Hill SCADA Fiber Replacement Project

Closes 11/19/2026Opened 10/29/2026

City of Hollywood·Florida

66% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

The Metropolitan Water District of Southern California·California

66% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

U.S. Department Of Defense·Oklahoma

66% match

Upgrade X-Ray Controller

Closes 11/5/2026Opened 10/29/2026

Prince William County Service Authority·Virginia

65% match

RFQ SA 2706-Applications Engineering Systems Supplier (AESS) Services

Closes 12/3/2026Opened 10/23/2026

West Basin Municipal Water District·California

65% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

City of Stillwater·Oklahoma

64% match

Stillwater Regional Water Treatment Plant Solid Contact Units Rehabilitation

Closes 11/11/2026Opened 10/10/2026

City of Montpelier·Vermont

64% match

Wastewater Collection System – Suction Lift Pump Station Equipment Preselection

Closes 12/3/2026Opened 10/28/2026

Cherry Hill Township·New Jersey

64% match

2027 Prof Services- SCADA Design, Install, Maint, Repair, & Process Control System Firm

Closes 11/6/2026Opened 10/6/2026

St. Johns County - Purchasing Department·Florida

64% match

VT SCADA Software Support for SJC Utilities Department

Closes 11/2/2026Opened 10/12/2026

City of San Diego·California

64% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

Metropolitan Council·Minnesota

64% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

U.S. Department Of Veterans Affairs·Washington

64% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

City of Salina·Kansas

64% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Riverton City·Utah

64% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

U.S. Department Of The Interior·New Mexico

64% match

C--BGNDRF PIPING UPGRADES

Closes 11/13/2026Opened 10/7/2026

Florida

64% match

DSAUTO06182026064305

Closes 1/31/2027Opened 9/18/2026

St. Helena Parish Police Jury·Louisiana

64% match

2026 CWEF Water System Improvements

Closes 11/5/2026Opened 10/9/2026

Massachusetts Department of Developmental Services·Massachusetts

64% match

DDS 27-06 Fire Sprinkler Upgrade Residential Group Home#2, Taunton

Closes 11/18/2026Opened 10/28/2026