The United States Air Force is seeking a contractor to replace power pit lids at Seymour Johnson Air Force Base. The contractor will be responsible for removing and disposing of the old lids, cleaning and preparing the mounting surfaces, and installing new lids and struts. The contractor will also be required to reinstall existing pushbutton controllers and inspect the electrical wiring. The project is expected to take 10 weeks to complete.
• The contractor must provide all management, tools, equipment, materials, transportation, and labor necessary to execute the project.
• The contractor must ensure that the materials used are aluminum and non-rusting, with a minimum of 400Hz output cable opening, and F900 certification rating required and skid proof grading.
• The contractor must comply with all applicable laws and regulations, including those related to safety and environmental protection.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.