The project involves designing and creating hydraulic placards for each sprinkler system on grounds, performing a 5-year internal inspection and flush of each sprinkler system, and recharging six exterior loops with antifreeze. The contractor will need to coordinate with the fire alarm administrator and facility maintenance daily for system shutdown while work is being performed. The scope of work includes providing and replacing any outdated gauges on the sprinkler system as needed, not leaving a building in fire watch status more than 24 hours at a time, and retagging each system with a blue tag after internal inspection and installation of placard is complete.
• Design and create hydraulic placards for each sprinkler system
• Perform internal flush and internal inspection of each system
• Recharge six exterior loops with antifreeze
• Coordinate with fire alarm administrator and facility maintenance
• Provide and replace any outdated gauges on the sprinkler system
• Not leave a building in fire watch status more than 24 hours at a time
• Retag each system with a blue tag after internal inspection and installation of placard is complete
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.