The Alabama Department of Conservation and Natural Resources (ADCNR) is seeking a single prefabricated steel bridge kit for the Big Canoe Creek Nature Preserve. The vendor must supply a complete bridge kit (8 ft wide × 20 ft long) capable of supporting a 4‑ton live load, include all required hardware, bump rails, drilling templates, and provide stamped engineering plans signed by an Alabama‑licensed Professional Engineer. Delivery of the kit to the preserve site is required by August 3 2026; installation is the purchaser’s responsibility. No installation services are needed, but the kit must be ready for immediate assembly by the client.
• Provide one (1) prefabricated steel bridge kit meeting ASTM AS00 Grade B specifications, 3/16 in wall thickness, black powder‑coat.
• Include all assembly hardware, two 10‑inch‑profile bump rails (20 ft each), and deck‑board drilling templates.
• Submit a product cut sheet, confirmation of hardware inclusion, and stamped engineering plans with load calculations.
• Deliver the complete kit to 1700 Murphree Valley Rd, Springville, AL 35146 by 08/03/2026; no on‑site installation required.
Attached files
Similar opportunities
Matched by Bid Banana AI™
Bid Banana · 1.6M+ bids and awards 🍌
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.