Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Y--FOMA REPLACE NATURE TRAIL BOARDWALK RS

U.S. Department Of The Interior·Florida

Y--FOMA REPLACE NATURE TRAIL BOARDWALK RS

Closes 6/26/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The National Park Service is seeking a contractor to replace the existing nature trail/boardwalk structure at the Fort Matanzas National Monument in St. Augustine, Florida. The project involves removing the old boardwalk, clearing vegetation, and installing a new 1033 ft long by 6 ft wide elevated boardwalk with three integrated seating areas equipped with benches and wayside exhibits. The contractor must comply with all applicable standards, including the Occupational Safety and Health Act, Florida Building Code, and International Building Code. The project requires the contractor to provide all labor, supervision, materials, tools, equipment, supplies, transportation, and incidentals necessary to complete the work. Some key requirements of the project include: • The new boardwalk must adhere to Architectural Barriers Act Accessibility Standard (ABAAS) compliance. • The boardwalk structure must be constructed with Prime Ground Contact Pressure-Treated Southern Yellow Pine. • The contractor must remove and properly dispose of the existing boardwalk and clear vegetation along the trail. • The contractor must ensure that all disturbed soil is raked/spread out to a smooth and uniform appearance of the undisturbed landscape. • The contractor must apply 2 coats of Olympic Waterguard Clear Sealer in accordance with the manufacturer’s instructions.

Attached files

Contact

Vazquez, William(Contracting Officer)

[email protected]

(470) 819-0934

Key dates

Opened
5/11/2026
Questions due
6/10/2026
Pre-bid meeting
6/8/2026
Site visit
6/8/2026
Closes
6/26/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
140P5426R0010

Budget estimate

$500,000 – $1,500,000

The budget for this project is likely to be in the range of $500,000 to $1,500,000, considering the scope of work, materials, and labor required. The project involves removing and replacing a 1033 ft long by 6 ft wide elevated boardwalk, which would require significant materials and labor costs. Additionally, the project requires compliance with various standards and regulations, which may also impact the cost. Factors that may influence the likely payment range include: - The cost of materials, such as Prime Ground Contact Pressure-Treated Southern Yellow Pine. - The cost of labor, including the cost of skilled workers and equipment operators. - The cost of equipment and tools required for the project. - The cost of permits and inspections. - The cost of contingency planning and risk management.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Open Space Institute·South Carolina

Top match · 68%

Meadows Boardwalk Trail Number

Closes 11/16/2026Opened 10/29/2026

Open Space Institute·South Carolina

67% match

The Meadows Boardwalk Trail Project

Closes 11/16/2026Opened 10/27/2026

Open Space Institute·South Carolina

67% match

The Meadows Boardwalk Trail Project

Closes 11/13/2026Opened 10/23/2026

City of Lincoln·California

65% match

Trail Maintenance RFP

Closes 11/13/2026Opened 10/21/2026

U.S. Department Of Transportation·New Jersey

65% match

NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge

Closes 12/15/2026Opened 10/28/2026

City of Norfolk·Virginia

65% match

Virginia Zoo - Africa Boardwalk Repairs

Closes 11/12/2026Opened 9/21/2026

City of Gainesville - Procurement Division·Florida

65% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

El Dorado Irrigation District·California

64% match

Sly Park Intertie Improvements - Habitat Mitigation and Monitoring Plan Implementation

Closes 11/12/2026Opened 10/16/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

64% match

RED TRAIL SLAB BRIDGE REPLACEMENT

Closes 11/2/2026Opened 10/9/2026

Mississippi Department of Finance and Administration·Mississippi

64% match

MMNS Trail Repairs (GS# 610-015)

Closes 11/17/2026Opened 10/15/2026

City of Green Bay·Wisconsin

64% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Kenosha County·Wisconsin

64% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Delaware County·Pennsylvania

64% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

County of Collier, FL·Florida

64% match

Freedom Park Boardwalk Repairs - Boardwalks 1 & 2

Closes 11/6/2026Opened 10/6/2026

Maryland Department of Natural Resources·Maryland

64% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

Mississippi Department of Finance and Administration·Mississippi

64% match

MMNS Trail Repairs – LeFleur's Bluff State Park (Bid #610‑015)

Closes 11/17/2026Opened 10/15/2026

California Grants·California

64% match

Prop 4 – Nature-Based Solutions (NBS)

Rolling / TBD closeOpened 6/8/2026

Great Rivers Greenway·Missouri

63% match

GRG 2026-009-725I - Missouri Greenway: Monarch Chesterfield Levee Trail Signage Replacement Project

Closes 11/6/2026Opened 10/12/2026

U.S. Department Of Agriculture·Colorado

63% match

Stove Prairie Campground Gate Replacement

Closes 11/11/2026Opened 10/20/2026

U.S. Department Of Agriculture·California

63% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

Environmental Conservation, NYS Department of·New York

63% match

2027 Cold River Horse Trail Backcountry Maintenance

Closes 11/18/2026Opened 10/14/2026

City of Elko·Nevada

63% match

HARP Trail Extension-Re

Closes 11/2/2026Opened 8/25/2026

Alaska Department of Transportation & Public Facilities·Alaska

63% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

Howard County, Office of Procurement·Maryland

63% match

Patuxent Branch Trail Improvements

Closes 12/23/2026Opened 10/23/2026

City of Elk Grove·California

63% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026