Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Water Treatment Plant No. 8 Membrane Expansion Progressive…

Palm Beach County Water Utilities Department·Florida

Water Treatment Plant No. 8 Membrane Expansion Progressive Design-Build

Closes 12/3/2025$10M – $50MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Palm Beach County Water Utilities Department is seeking a Design-Build Entity to provide services related to the expansion and hardening of Water Treatment Plant No. 8. The scope of work includes permitting, design, construction, commissioning, training, and handover of various project elements, such as membrane buildings, pre-treatment systems, and post-treatment processes. The selected entity will also provide professional/consulting design engineering and construction services, including safety improvements, replacement or repair of critical components, and expansion of capacity. • Plant expansion and hardening • Membrane building • Membrane system and associated equipment • Pre-treatment systems • Post-treatment processes • Pilot testing with membranes for PFAS removal efficiencies • Ion exchange • Deep injection well and associated dual zone monitoring well • Ground storage tanks • Pumping systems • Production wells • Clearwell • New electrical system and building • Process, reliability and chemical systems improvements • Safety • Electrical and instrumentation and controls improvements • Air scrubbers and associated equipment • Demolition/decommissioning of existing treatment The professional/consulting design engineering and construction services may include, but are not limited to, the following: • Safety improvements • Replacement or repair of critical components • Expansion of capacity • Energy efficiency • Alternate energy • Sustainability • Alternative water supply • Redundancy of critical components • Data collection • Site visits • Survey including easements • Sub-surface utility explorations • Geotechnical Investigations (e.g. soil survey, corrosion analysis) • Environmental assessment (e.g. Phase I and/or Phase II audits, cultural/historical resources, ecological resources, endangered species) • Stakeholder coordination • Hydraulic analysis and modeling • Hydrogeological services • Pilot testing • Laboratory analysis • Studies and reports • Regulatory requirements • Permitting • Progressive Design-Build Services • Design (drawings and specifications) • Construction • Construction management services • Stormwater design • Electrical engineering services • Instrumentation and controls engineering services • Cost estimating • Value engineering • Asset management • Security • Bidding support • Engineering services during planning, evaluation, design and/or construction • Grant and funding assistance • Operation and maintenance manuals • PLC programming and SCADA • Procurement • Public outreach • Other related progressive Design-Build services

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jeff Greenfield(Main Contact)

[email protected]

(561) 493-6149

Key dates

Opened
10/6/2025
Pre-bid meeting
10/8/2025
Site visit
10/9/2025
Closes
12/3/2025

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
541330
Solicitation №
RFP-25-034-0-2025/JG

Budget estimate

$10,000,000 – $50,000,000

Based on the scope of work and the fact that the project involves the expansion and hardening of a water treatment plant, the estimated budget for this project could range from $10 million to $50 million. This estimate is influenced by the complexity of the project, the need for specialized design and construction services, and the potential costs associated with permitting, commissioning, and training.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Sun 'n Lake Improvement District·Florida

Top match · 76%

Wastewater Treatment Plant Progressive Design-Build Services

Closes 11/20/2026Opened 10/19/2026

City of Cincinnati·Ohio

76% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 9/16/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

76% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 10/28/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

75% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/21/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

74% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/14/2026

Oregon City of Ashland·Oregon

74% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

Town of Jupiter·Florida

74% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

City of Cincinnati·Ohio

74% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 9/16/2026

City of Ontario·California

72% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

City of Neptune Beach·Florida

72% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

City of Hollywood·Florida

71% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Massachusetts Auburn Water District Inactive·Massachusetts

71% match

Qualifications for Water Treatment Plant Construction

Closes 1/4/2027Opened 10/28/2026

City of Hollywood·Florida

71% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

The Metropolitan Water District of Southern California·California

71% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

City of Charlotte·North Carolina

71% match

Progressive Design-Build Services for Lee S. Dukes WTP Expansion

Rolling / TBD closeOpened 3/23/2026

City of Ashland·Oregon

71% match

City of Ashland, Ashland Creek Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Bakersfield·California

71% match

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

Johnson County Wastewater·Kansas

71% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

Eastern Municipal Water District·California

71% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

Fort Pierce Utilities Authority·Florida

71% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

Town of Queen Creek·Arizona

70% match

Design/Build - Industrial Wastewater Treatment Facility

Closes 12/8/2026Opened 10/22/2026

City of Harrisonburg·Virginia

70% match

Water Treatment Plant Sedimentation Basin Plate Settlers Project RFP (2027004-PU-DB)

Closes 12/10/2026Opened 10/6/2026

Washington Suburban Sanitary Commission, MD·Maryland

70% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

City of Hollywood·Florida

70% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

City of Temple Terrace, FL·Florida

70% match

Professional Engineering Services for PFAS Compliance Nanofiltration Treatment, and Concentrate Management

Closes 11/16/2026Opened 10/6/2026