Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Construction
  5. ›26-0229 New Pershing High School Bid Release 2B

Michigan Detroit Public Schools Community District·Michigan

26-0229 New Pershing High School Bid Release 2B

Closes 3/9/2026$50M – $100MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Detroit Public Schools Community District is seeking bids for the construction of a new Pershing High School. The project includes the construction of a one-story, 100,800 SF building and adjacent site and parking. The bid package includes various divisions of work, such as general requirements, concrete, masonry, metals, wood, plastics, and composites, thermal and moisture protection, openings, finishes, specialties, equipment, and more. The contractor will be responsible for coordinating with the owner, architect, and other stakeholders to ensure the project is completed on time and within budget. Some key aspects of the project include: • Construction of a new high school building and site work • Multiple prime contracts, each based on a stipulated price • Owner intends to occupy adjacent portions of the building site during construction and the new building upon substantial completion • Contractor must cooperate with the owner to minimize conflict and facilitate owner operations • The project includes various mechanical, electrical, and plumbing systems, as well as fire suppression and security systems • The contractor will be required to provide progress schedules, coordination drawings, and other documentation throughout the project • The project will require the contractor to work with multiple stakeholders, including the owner, architect, and other contractors • The contractor will be responsible for ensuring that all work is completed in accordance with the contract documents and applicable codes and regulations Some of the key products and materials that will be used in the project include: • Concrete and masonry materials • Metals, such as steel and aluminum • Wood and plastic materials • Thermal and moisture protection materials, such as insulation and roofing • Doors, windows, and other openings • Finishing materials, such as flooring, walls, and ceilings • Specialty items, such as elevators and fire suppression systems • Mechanical, electrical, and plumbing equipment and materials The contractor will be required to provide a detailed schedule of values, applications for payment, and other documentation throughout the project. The contractor will also be responsible for coordinating with the owner and other stakeholders to ensure that the project is completed on time and within budget.

Attached files

Contact

Maisha Parham(Buyer)

[email protected]

(313) 873-2753

Key dates

Opened
3/3/2026
Closes
3/9/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
RFP-DET-260000001128-2

Budget estimate

$50,000,000 – $100,000,000

The budget for this project is likely to be in the tens of millions of dollars, given the scope of the work involved. A rough estimate for the construction of a new high school building of this size could be between $50 million and $100 million, depending on the specifics of the project, such as the materials used, the complexity of the design, and the location. This estimate is based on industry benchmarks for similar projects and takes into account the various components of the project, including site work, building construction, and installation of mechanical, electrical, and plumbing systems.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Michigan Troy School District Board of Education·Michigan

Top match · 74%

RFP2627-02 BP#4A - Athens High School Addition

Closes 11/4/2026Opened 10/29/2026

Michigan Westwood Community School District·Michigan

72% match

Westwood - 2027 BP-07 All School Upgrades

Closes 11/13/2026Opened 10/28/2026

Michigan Warren Consolidated Schools·Michigan

72% match

RFP - WCS 2022 Bond - BP 18 SHHS PAC

Closes 11/5/2026Opened 10/22/2026

Michigan Hart Public Schools·Michigan

71% match

Hart Public Schools Request for Bids

Closes 11/5/2026Opened 10/21/2026

Michigan Warren Consolidated Schools·Michigan

71% match

2022 Bond- BP14 Angus Roof, Wilde, Wilkerson, Carter, Cromie

Closes 11/5/2026Opened 10/16/2026

Michigan Ann Arbor Public Schools·Michigan

71% match

IFB 27.0006 Scarlett & Clague Auditorium Renovation

Closes 11/18/2026Opened 10/27/2026

State of Delaware COL·Delaware

71% match

William Penn High Bid Pack B

Closes 11/12/2026Opened 10/16/2026

City of Bridgeport·Connecticut

71% match

John Winthrop Elementray School Phase 2 - Construction (Bid Packages 1.09 -1.15)

Closes 11/17/2026Opened 10/18/2026

Scott County School District·Mississippi

71% match

Scott County School District E-Rate C2 2027

Closes 12/8/2026Opened 10/29/2026

Caddo Parish Public Schools·Louisiana

70% match

Bid 02S-27-Sale-Mooretown Elementary

Closes 12/1/2026Opened 10/29/2026

Michigan South Lyon Community Schools·Michigan

70% match

AD FOR BID PROPOSALS-SAYRE RENOVATIONS

Closes 11/11/2026Opened 10/26/2026

Des Moines Public Schools·Iowa

70% match

ROOSEVELT HIGH SCHOOL – RE-ROOFING PHASE I PROJECT

Closes 11/5/2026Opened 10/8/2026

Little Rock School District·Arkansas

70% match

Little Rock School District Invitation for Bids – Fire Alarm Replacement for Hall High

Rolling / TBD closeOpened 9/13/2026

Michigan Troy School District·Michigan

70% match

RFP2627-03 TSD Roofing Projects 2027

Closes 11/10/2026Opened 10/12/2026

Michigan Huron Valley Schools·Michigan

70% match

Lakeland HS Improvements and Other Updates

Closes 11/5/2026Opened 10/9/2026

San Gabriel Unified School District·California

70% match

2026-Bid-SG-06_AddendumOne_Narrative-McKinley Irrigation Replacement

Rolling / TBD closeOpened 7/21/2026

Michigan Clarkston Community Schools·Michigan

70% match

District Wide Improvements

Closes 11/10/2026Opened 10/23/2026

St. Tammany Parish School Board·Louisiana

70% match

Pearl River High School, Re-Bid of Cafeteria Building Addition for ADA Restroom and Alterations to Stage Area, STPSB Project No. 1954

Closes 11/4/2026Opened 10/7/2026

Michigan Godwin Heights Public Schools·Michigan

70% match

High School Addition & Renovations

Closes 11/24/2026Opened 10/29/2026

City of Holyoke, MA·Massachusetts

70% match

IFB 2026-62SD

Rolling / TBD closeOpened 6/17/2026

Michigan Bridgman Public Schools·Michigan

70% match

Bridgman High School 2027 Renovations

Closes 11/12/2026Opened 10/15/2026

Georgia Houston County School District·Georgia

70% match

27-503 BASEBALL-SOFTBALL IMPROVEMENTS

Closes 11/3/2026Opened 9/25/2026

Michigan Royal Oak Schools·Michigan

70% match

ROYAL OAK HIGH SCHOOL ROOFING REPLACEMENT

Closes 11/17/2026Opened 10/13/2026

Central Unified School District·California

69% match

Bid2627-1 Pool Chemicals Public Notice(opens in new window)

Closes 11/16/2026Opened 10/28/2026

City of Bridgeport·Connecticut

69% match

John Winthrop Elementray School Phase 2 - Construction (Bid Packages 1.02- 1.08)

Closes 11/17/2026Opened 10/18/2026