Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Water and Wastewater
  5. ›Turbidity Meters for the Metropolitan Water District…

The Metropolitan Water District of Southern California·California

Turbidity Meters for the Metropolitan Water District Skinner and Deimer Filtration Plants

Closes 4/21/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Metropolitan Water District of Southern California is seeking vendors to supply a full set of turbidity meters for its Skinner and Diemer water‑filtration plants. The contract is a “FOB Destination” purchase; the supplier must deliver the units to the two plant sites and include delivery in the unit price. Delivery must occur within 90‑120 days after receipt of order (ARO) or as soon as factory production schedules allow. Bidders must submit an electronic response via PlanetBids, include a bid bond (scanned copy uploaded before the deadline and original mailed within five business days), and provide all required documents (Bidder Information Sheet, drawings, client references, conflict‑of‑interest statement, and acceptance of standard terms). No hard‑copy submissions are accepted. • Supply and ship 64 turbidity meters (plus associated kits) to two MWD filtration plants (Di­emer, Yorba Linda, CA and Skinner, Winchester, CA). • Delivery lead time 90‑120 days ARO; unit price must include freight to the destination. • Mandatory electronic bid submission with bid bond; all required forms must be attached or the bid will be rejected. • Contract is governed by MWD’s standard terms and conditions (including warranty, insurance, and termination clauses).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Angelo Sarao

[email protected]

(213) 217-7610

Key dates

Opened
3/24/2026
Questions due
4/7/2026
Closes
4/21/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
423830
Solicitation №
RFB-AS-470807-A

Budget estimate

$200,000 – $500,000

The solicitation does not disclose a contract value. Based on typical pricing for high‑end online turbidity meters (approximately $3,000‑$5,000 per unit) plus accessories and warranty, the 64‑unit purchase could range from roughly $200,000 to $350,000. Adding freight, installation‑free setup, and possible spare‑part kits could push the upper bound toward $500,000. Therefore a reasonable estimate for the total award is $200k‑$500k.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 71%

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

The Metropolitan Water District of Southern California·California

70% match

Furnish one hundred sixty (160) Chemical Flow Meters for the Metropolitan Water District Skinner Plant

Closes 12/7/2026Opened 10/26/2026

City of Ontario·California

68% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

Massachusetts Town of Kingston·Massachusetts

68% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

City of Melbourne·Florida

68% match

Water and Sludge Analysis Services

Closes 11/3/2026Opened 10/2/2026

Town of Leesburg·Virginia

67% match

IFB No. 500630-FY27-22 Water Storage Tank Cleaning and Inspection Services

Closes 11/5/2026Opened 10/7/2026

NYS Rockland County·New York

67% match

Flow Meter Inspection, Calibration and Testing Services

Closes 11/16/2026Opened 10/23/2026

Commonwealth of Kentucky·Kentucky

67% match

Water and Wastewater Operations, Maintenance, Monitoring

Closes 11/16/2026Opened 10/28/2026

Texas Tx Comm On Environ Quality·Texas

67% match

Membrane Filters

Closes 11/4/2026Opened 10/20/2026

Town of Leesburg·Virginia

67% match

Water Storage Tank Cleaning and Inspection Services

Closes 11/5/2026Opened 10/7/2026

City of Framingham·Massachusetts

66% match

Nuisance Aquatic Vegetation Management Services For City Of Framingham’s Ponds And Sudbury River

Closes 11/19/2026Opened 10/28/2026

City of Ann Arbor·Michigan

66% match

Testing of Odor-Reducing Chemical Treatment for Municipal Sludge

Closes 11/18/2026Opened 10/22/2026

The Metropolitan Water District of Southern California·California

66% match

Solids Removal and Disposal Services for MWD Skinner Water Treatment Plant

Closes 11/19/2026Opened 10/15/2026

Dickenson County·Virginia

66% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Los Angeles County Sanitation Districts·California

66% match

ENVIRONMENTAL ANALYTICAL LABORATORY SERVICES

Closes 11/30/2026Opened 10/31/2026

City of Midland·Michigan

66% match

ITB 4698 - Midland WTP Online Turbidity Analyzers

Closes 11/10/2026Opened 10/26/2026

Chittenden County Regional Planning Commission·Vermont

66% match

Ongoing Call: RFQ TO MUNICIPALITIES & ORGANIZATIONS TO SERVE AS WATER QUALITY IMPROV

Closes 12/31/2026Opened 7/18/2022

Saline County Waterworks and Sanitary Sewer Public Facilities Board·Arkansas

66% match

Saline County Waterworks & Sanitary Sewer Public Facilities Board – WWTP Improvements

Closes 11/12/2026Opened 10/18/2026

City of Franklin·Tennessee

66% match

Wastewater Treatment Laboratory Services for the City of Franklin, TN Water Management Department

Closes 11/4/2026Opened 10/8/2026

Township of North Brunswick·New Jersey

66% match

Water/Wastewater Consulting Services

Closes 11/13/2026Opened 10/21/2026

Beaufort - Jasper Water & Sewer Authority·South Carolina

66% match

Great Swamp Wetlands Monitoring Services

Closes 11/19/2026Opened 10/9/2026

The Metropolitan District·Connecticut

66% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

Washington Suburban Sanitary Commission, MD·Maryland

66% match

Furnish and Deliver Small and Large Water Meters

Closes 11/2/2026Opened 9/21/2026

City of Montpelier·Vermont

66% match

Wastewater Collection System – Suction Lift Pump Station Equipment Preselection

Closes 12/3/2026Opened 10/28/2026

Florida Department of Corrections (FDC)·Florida

66% match

Laboratory Analysis on Water Treatment Plants, Wastewater Treatment Plants, and Groundwater Monitor

Closes 8/30/2027Opened 9/30/2026