Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›EIE485 Consolidated Munitions on Quarry Hill, Eielson AFB…

U.S. Department Of Defense·United States of America

EIE485 Consolidated Munitions on Quarry Hill, Eielson AFB, AK

Closes 10/13/2026$150M – $200MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers Alaska District is conducting market research for the EIE485 Consolidated Munitions project at Eielson Air Force Base, Alaska. The effort involves designing and constructing new munitions storage facilities on Quarry Hill and demolishing existing structures on Engineer Hill, approximately 12 miles apart. The scope includes a warm‑storage vehicle building, a cold inert storage building, four heated 4‑bay magazines, a production facility, and extensive demolition (≈27,550 SF) and site‑improvement work (≈5,875 SF). Funding is MILCON with a target budget of $196.4 M and a performance period spanning FY 27‑FY 31. The agency is seeking industry input via a Sources‑Sought/RFI questionnaire to determine the optimal delivery method (FAR‑based DBtB, CM‑at‑Risk OTA, or Progressive Design‑Build OTA) and to identify risks, cost drivers, and schedule constraints, especially those related to Alaska’s permafrost, high water table, and potential contamination (PFAS, asbestos, PCBs). • Location: Quarry Hill and Engineer Hill, Eielson AFB, Alaska (≈12 mi apart) • Total estimated value: $196.4 M (MILCON) • Facilities: warm‑storage vehicle (24,700 SF), cold inert storage (10,075 SF), 4× magazines (1,350 SF each), production building (26,700 SF), demolition (≈27,550 SF) • Key challenges: permafrost, high water table, soil contamination, limited Alaskan construction season, coordination with Air Force standards (DESR 6055.09, AFMAN 91‑01) • Desired outcomes: determine best delivery method, gather risk‑mitigation ideas, assess cost‑certainty, and evaluate contractor capability/bonding. • Target budget realism and schedule (design start FY 27, construction not earlier than FY 29) are under review. • Primary contact for questionnaire: Kimberly Tripp (USACE Alaska) – email and phone provided.

Attached files

Contact

Kimberly Tripp

[email protected]

(907) 753-5690

Key dates

Opened
9/29/2026
Closes
10/13/2026
Duration
5 years

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
236220
Solicitation №
W911KB27RWP04

Budget estimate

$150,000,000 – $200,000,000

The solicitation cites a target budget of $196.4 M for the combined design, construction, and demolition effort. Assuming typical contractor fees (≈10‑15 % of total project cost) and potential cost‑plus adjustments for hazardous‑material remediation, the expected net revenue for a prime contractor would likely fall between $150 M and $200 M. Factors influencing the final amount include the chosen delivery method (DBtB vs. OTA), the extent of schedule‑risk premiums, and any award‑fee or cost‑saving incentives incorporated into the contract.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Nebraska

Top match · 67%

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026

U.S. Department Of Defense·Alaska

65% match

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026

U.S. Department Of Defense·United States of America

65% match

Vehicle Maintenance Shop, Kadena Air Base

Closes 3/31/2027Opened 9/30/2026

U.S. Department Of Defense·Alaska

65% match

(EAR048) Repair Fire Alarm System Eareckson Air Station Facilities

Closes 11/16/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

65% match

INDUSTRY PARTNERSHIP OPPORTUNITY: U.S. Army Test and Evaluation Command (ATEC) Announces Availability of Premier National Test Ranges

Closes 9/30/2027Opened 12/19/2025

U.S. Department Of Defense·Florida

65% match

KC-46A ADAL Apron and Hydrant Fueling Pits

Closes 11/18/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

65% match

Apache Alert Mission Complex

Closes 1/8/2027Opened 10/1/2026

U.S. Department Of Defense·Maryland

64% match

INDUSTRY PARTNERSHIP OPPORTUNITY: U.S. Army Test and Evaluation Command (ATEC) Announces Availability of Premier National Test Ranges

Closes 9/30/2027Opened 9/25/2026

U.S. Department Of Defense·Oklahoma

64% match

Hill Industry Day Quad Charts

Closes 1/15/2027Opened 12/5/2025

U.S. Department Of Defense·Oklahoma

64% match

Hill Industry Day Opportunities

Closes 12/3/2026Opened 10/30/2026

U.S. Department Of Defense·Hawaii

64% match

Munitions Maintenance and Inspection Facility and Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HI

Closes 11/12/2026Opened 10/7/2026

U.S. Department Of Defense·Utah

64% match

F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah

Closes 11/12/2026Opened 10/21/2026

U.S. Department Of Defense·North Carolina

64% match

Bullet Traps Operation and Maintenance/Lead Cleaning for Breach and Shooting Houses

Closes 11/10/2026Opened 10/29/2026

U.S. Department Of Defense·Utah

64% match

F-16 Horizontal Stabilizer

Closes 11/13/2026Opened 10/14/2026

U.S. Department Of Defense·Florida

64% match

FIRE APPARATUS INTERCOM SYSTEM UPLIFT AND INSTALLATION

Closes 9/4/2027Opened 8/24/2026

U.S. Department Of Defense·Illinois

64% match

Deep Pit Furnace

Closes 11/27/2026Opened 10/27/2026

U.S. Department Of Defense·Texas

64% match

Fort Benning Base Operations - W5168W26RA015

Closes 11/13/2026Opened 8/4/2026

U.S. Department Of Defense·Wyoming

64% match

PKA Relocatable Facility

Closes 12/12/2026Opened 12/4/2025

U.S. Department Of Defense·Utah

64% match

SABER V Hill AFB

Closes 11/5/2026Opened 8/31/2026

U.S. Department Of Homeland Security·North Carolina

64% match

Mount Assy

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·Utah

64% match

SABER V Hill AFB

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Defense·Washington

64% match

Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3223 and 3224

Closes 11/13/2026Opened 9/16/2026

U.S. Department Of Defense·New Jersey

63% match

Primer Feed Mechanisms (PFMs)

Closes 11/18/2026Opened 4/21/2026

Georgia Gwinnett County Board of Commissioners·Georgia

63% match

BL003-27 Provision of Cleaning and Testing Services for the Firing Range Complex on an Annual Contra

Closes 11/13/2026Opened 10/27/2026

U.S. Department Of Defense·Utah

63% match

F-16 Grip Assembly, Contr

Closes 11/30/2026Opened 10/29/2026