Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›Central District, Cole County, Tanner Bridge Road, Road…

Missouri Department of Transportation·Missouri

Central District, Cole County, Tanner Bridge Road, Road and Bridge Replacement

Closes 11/21/2025$1M – $10MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the replacement of the Tanner Bridge Road bridge over the Moreau River and safety improvements to approximately 0.38 miles of Tanner Bridge Road. The work includes removals, clearing, grading, excavating, bridge construction, asphalt pavement, guardrail, rock blanket, pavement marking, seeding, and mulching. The project also includes an HMA overlay of a 0.1-mile stretch of Tanner Bridge Road. The contractor must be on MoDOT's Qualified Contractor List and provide a 10-Hour OSHA construction safety program. The project has a DBE goal of 0% for both BRO-R026(025) and Cole County 2023-602-1. Key points to consider: • The project requires a certified or cashier's check or a bid bond in the amount of 5% with each proposal. • The project will be awarded to the lowest, responsive, responsible bidder, determined by the combined total of the bids for both projects. • Failure to submit a bid for either project will result in the bid being deemed non-responsive or irregular. • No 2nd tier subcontracting will be allowed on this project.

Attached files

Contact

[email protected]

(573) 636-3614

Key dates

Opened
10/27/2025
Pre-bid meeting
11/13/2025
Closes
11/21/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
BRO-R026(025) and Cole County 2023-602-1

Budget estimate

$1,000,000 – $10,000,000

The budget for this project can be estimated based on the scope of work, which includes bridge replacement, road safety improvements, and asphalt pavement. The cost of such a project can range from $1 million to $10 million, considering the materials, labor, and equipment required. A more accurate estimate would depend on the specific details of the project, such as the size of the bridge, the length of the road, and the type of materials used.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Carver County·Minnesota

Top match · 69%

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

Daviess County·Missouri

68% match

Daviess County: Bridge Replacement - Bridge No. 3960007; BRO-R031 (002); Forest Avenue

Closes 11/18/2026Opened 10/16/2026

Missouri Department of Transportation·Missouri

67% match

SE District, St. Francois County, Silver Springs Road Bridge Replacement

Closes 11/10/2026Opened 10/15/2026

Hardin County·Kentucky

67% match

Horseshoe Bend Road Bridge Repairs

Closes 11/2/2026Opened 10/22/2026

Shawnee County·Kansas

66% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

Missouri Department of Transportation·Missouri

66% match

NW District, Daviess County, construction of a 97’-7 7/8” long, single span, W40x235 Steel I-Girder bridge at 20-degree L.A. skew and 3.5% grade, located on Forest Avenue

Closes 11/18/2026Opened 10/19/2026

Benewah County·Idaho

66% match

Charlie Creek Road over Santa Creek Bridge Replacement 30090-117

Closes 11/19/2026Opened 10/30/2026

County of Chester·Pennsylvania

66% match

Bridge Rehabilitation for County Bridge #196 and Construction for County Bridge #326

Closes 11/25/2026Opened 10/23/2026

Union County Fiscal Court·Kentucky

66% match

Hitesville Road Bridge Replacement Bid

Closes 11/10/2026Opened 10/20/2026

NYS Niagara County·New York

66% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

Lewis County·Washington

66% match

Davison Rd MP 0.01 Bridge Rehabilitation

Closes 11/19/2026Opened 10/29/2026

Missouri Department of Transportation·Missouri

66% match

SE District, St, Francois County, King School Road Replacement

Closes 11/10/2026Opened 10/15/2026

Cherokee Nation·Oklahoma

66% match

Bridge 67 over Pecan Creek (Coos Thompson)

Closes 11/10/2026Opened 10/5/2026

County of Chester·Pennsylvania

66% match

Bridge Rehabilitation for County Bridge #190

Closes 11/25/2026Opened 10/22/2026

Portage County·Ohio

66% match

Ravenna Rd Bridge Replacement Project-Bid

Rolling / TBD closeOpened 4/2/2026

Minnesota Department of Transportation·Minnesota

66% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Sedgwick County·Kansas

65% match

Bridge Improvements (B515)

Closes 11/3/2026Opened 10/21/2026

California Department of Transportation·California

65% match

Temp bridge, deck portion Repl, hang conduit, & polyester Conc overlay

Closes 11/4/2026Opened 9/28/2026

Camden County·New Jersey

65% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Missouri Department of Transportation·Missouri

65% match

KC District, City of Smithville, construction of a single lane roundabout at the intersection of Bridge Street

Closes 11/3/2026Opened 9/30/2026

Division of Highways·North Carolina

65% match

Replacement of Bridge 560098 (Purchase Order DM00407)

Closes 11/18/2026Opened 10/28/2026

Division of Highways·North Carolina

65% match

Replacement of Bridge 12 on State Road 1337, Cleveland County, NC

Closes 11/10/2026Opened 10/19/2026

California Department of Transportation·California

65% match

Colorado River bridge replacement.

Closes 12/17/2026Opened 10/26/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

65% match

Traffic Circle at SW 62nd Ave. And SW 48th Street

Closes 12/2/2026Opened 10/23/2026

Town of Pulaski·Virginia

65% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026