The State of Michigan is seeking a contractor to perform HVAC upgrades at the Parnall Correctional Facility. The project involves upgrading the heating and ventilation systems in multiple buildings. The contractor will be required to submit an Hour by Hour Schedule for review 2 weeks prior to implementing the construction. The schedule must include days of the week, building systems, perimeter detection, video management, and life safety systems affected, as well as additional security measures. The contractor must also ensure that all work and materials conform to the rules and requirements of the National Fire Protection Association, the local Electrical Code, and present manufacturing standards.
• The contractor must meet specific standards for equipment and installation, including those outlined in the National Electrical Code (NEC) and the National Fire Protection Association (NFPA).
• The contractor must use approved manufacturers for Cat 6 copper horizontal distribution cables and termination equipment.
• The contractor must follow specific guidelines for data cabling, conduits, and screws and fasteners.
• The contractor must ensure that all materials are UL Listed and meet the requirements of the National Fire Protection Association and the local Electrical Code.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.