The Cedar Rapids Community School District is seeking bids for the construction of a new elementary school on the Van Buren site. The project includes general construction, sprinkler, mechanical, and electrical work. The bid package includes 19 different bid packages, each with its own set of specifications and requirements. The project is expected to start in March 2026 and be completed within 365 days.
• The bid packages include site demolition, excavation, foundations, masonry, siding, general construction, roofing, aluminum and glazing, metal framing and drywall, flooring, acoustical, painting and coverings, foodservice, elevator, fire suppression, mechanical complete, electrical complete, structured cabling, and landscaping.
• The bid documents are available electronically, and a deposit is required for printed documents.
• The contractor will be responsible for providing labor, materials, equipment, and supervision for the project.
• The project includes a pre-bid conference and a site tour.
• The bid due date is March 5, 2026, and the construction start date is expected to be in March 2026.