The Jacksonville Port Authority is seeking a qualified contractor to remove and replace the trolley‑rail, wheel, clip, and pad system on ZPMC ship‑to‑shore crane #10487 located at the Talleyrand Marine Terminal. The work includes complete removal of existing rail and hardware, supply and installation of new A75 rail sections, clips, pads, shear blocks, and four trolley‑wheel assemblies, plus welding, alignment, testing, and final documentation. The contractor must provide all labor, equipment, safety plans, environmental controls, and obtain required hot‑work and TWIC credentials. Work is to be completed within a 30‑day period after receipt of the Notice‑to‑Proceed, with liquidated damages of $1,699 per day for overruns.
• Provide all materials (A75 rail, clips, pads, welding supplies) and perform full removal, installation, and alignment of the crane’s trolley‑rail system.
• Conduct safety, environmental, and quality inspections, submit required submittals, and obtain all permits (OSHA, EPA, Coast Guard hot‑work).
• Coordinate with JAXPORT port operations to avoid vessel traffic impacts; work may be 24/7 subject to vessel schedules.