Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›Mill & Overlay approximately 7 miles of US 82 from 1 mile…

Mississippi Department of Transportation·Mississippi

Mill & Overlay approximately 7 miles of US 82 from 1 mile east of Military Road to the Alabama State Line known as Project No. NHPP-0011-03(088) / 108649301 in Lowndes County

Closes 4/10/2026$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Mississippi Department of Transportation is seeking bids for a project to mill and overlay approximately 7 miles of US 82 from 1 mile east of Military Road to the Alabama State Line. The project is known as Project No. NHPP-0011-03(088) / 108649301 in Lowndes County. The contractor will be required to follow the Mississippi Standard Specifications for Road and Bridge Construction. The bid bond must be signed or countersigned by a Mississippi Agent or Qualified Nonresident Agent, with Power of Attorney attached. A Cashier's check or Certified Check for 5% of the bid payable to the State of Mississippi must accompany each proposal. • The project involves mill and overlay of approximately 7 miles of US 82. • The project is located in Lowndes County. • The bid must be submitted through the Bid Express Service. • The bid must be accompanied by a bid bond and a Cashier's check or Certified Check for 5% of the bid. • The contractor must follow the Mississippi Standard Specifications for Road and Bridge Construction.

Attached files

Contact

Neal Dougherty

[email protected]

Key dates

Opened
4/3/2026
Closes
4/10/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
352-20260319174328 MDOT

Budget estimate

$1,000,000 – $5,000,000

The budget for this project is likely to be in the range of $1 million to $5 million, based on the scope of the project, which involves mill and overlay of approximately 7 miles of US 82. The cost of materials, labor, and equipment will be significant, and the contractor will need to factor in the cost of the bid bond and the Cashier's check or Certified Check for 5% of the bid. The actual budget will depend on the bid amount and the contractor's ability to complete the project within the specified timeframe and budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Alabama Department of Transportation·Alabama

Top match · 71%

CE&I for NH-I010(352) I-10 from Bayway Bridge to SR-181

Closes 11/20/2026Opened 10/30/2026

Jackson County Board of County Commissioners·Florida

70% match

ITB 2627-02 - Milling, Resurfacing Old US Road-CR 167 FPID 453534-1-54-01

Closes 11/5/2026Opened 10/1/2026

Goodwyn Mills Cawood·Alabama

69% match

County Road 64 Water Line Relocation for the Belforest Water System

Closes 11/19/2026Opened 10/14/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

Texas Department of Transportation·Texas

68% match

STATE LET CONSTRUCTION CONTRACT, HAYS CO, FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY FR

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

City of Slidell·Louisiana

68% match

27-B009 Taxilane Mill and Overlay

Closes 11/10/2026Opened 10/7/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

Marshall County Board of Supervisors·Mississippi

68% match

Asphalt Paving Project Barringer Road and Dogwood Road DIP 448 for the Marshall County Board of Supervisors

Closes 11/6/2026Opened 10/8/2026

Maryland State Highway Administration·Maryland

68% match

WA0925272 - I-81 (Maryland Veterans Memorial Highway) - Phase 2A from MD 63/MD 68 to I-70 6 Lane Divided Construct

Closes 12/3/2026Opened 10/27/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

Agency of Transportation - Contract Administration·Vermont

68% match

Norwich-Bradford IM 091-2(99)

Closes 11/13/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)

Closes 3/23/2027Opened 2/4/2025

Vermont Agency of Transportation - Contract Administration·Vermont

67% match

Norwich-Bradford IM 091-2(99)

Closes 11/13/2026Opened 10/21/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

Alabama Department of Corrections·Alabama

67% match

ACCT/TMBR/FOUN- Tree Planting, Loblolly Pine Seedlings

Closes 10/31/2026Opened 10/16/2026

Alabama U.S. Army National Guard·Alabama

67% match

Tree Removal Services at Dothan NGA

Closes 11/3/2026Opened 10/21/2026

Alabama State Military Department·Alabama

67% match

Military HVAC Service/Maint,/Repairs Region 2B

Closes 12/1/2026Opened 9/1/2026

U.S. Department Of Defense·Arkansas

67% match

Bayou Meto Canal 1000, Phase 4.1, Check Structure

Closes 11/5/2026Opened 10/5/2026

Clay County·Florida

67% match

County Road 220 Phase 2 – Milling and Resurfacing

Closes 11/30/2026Opened 10/15/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026