Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Civil Engineering
  5. ›QBS/DOT/2620-1270098 PATH Lakewood Trail

City of Atlanta·Georgia

QBS/DOT/2620-1270098 PATH Lakewood Trail

Closes 10/30/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Atlanta is seeking qualified professional services to design a paved shared‑use path that will connect the Southside Beltline Trail to the Southtowne Trail at South Bend Park. The work is divided into two phases, with Phase I covering the segment from the Southside Trail to Pryor Road at Meldon Avenue. The contract will be awarded through a Qualified Bidder Selection (QBS) process, and proposals must be submitted by the close date. The design will likely include alignment planning, grading, drainage, pavement design, ADA compliance, and coordination with existing trail infrastructure. • Scope: Conceptual and detailed engineering design for a multi‑mile shared‑use path (Phase I). • Deliverables: Design drawings, specifications, cost estimates, permitting support, and construction‑ready documents. • Schedule: Bids open 2026‑10‑12, close 2026‑10‑30; design work expected to commence shortly after award. • Evaluation: QBS criteria focusing on experience, technical approach, and past performance in similar trail or transportation projects. • Location: City of Atlanta, GA, primarily within the Southside Beltline corridor.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Bonnie Davis(Buyer)

[email protected]

Key dates

Opened
10/12/2026
Closes
10/30/2026

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
1270098

Budget estimate

$200,000 – $500,000

Based on typical municipal trail design contracts of comparable length (approximately 2–3 miles) and complexity (grading, drainage, ADA compliance, coordination with existing infrastructure), the design services are likely to be valued between $200,000 and $500,000. Lower‑end estimates assume a streamlined scope with limited stakeholder coordination; higher‑end estimates reflect extensive environmental studies, detailed construction‑ready drawings, and robust permitting support.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Sunnyvale Procurement Bids and RFPs·California

Top match · 63%

Lakewood Safe Routes to School

Closes 11/18/2026Opened 10/23/2026

Iowa City·Iowa

63% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

Mississippi Department of Finance and Administration·Mississippi

62% match

MMNS Trail Repairs – LeFleur's Bluff State Park (Bid #610‑015)

Closes 11/17/2026Opened 10/15/2026

Cobb County·Georgia

61% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Cincinnati·Ohio

61% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Massachusetts Department of Transportation·Massachusetts

61% match

616509 DISTRICT 6 Scheduled & Emergency Tree Trimming & Sight Distance Improvement at Various Loca

Closes 11/3/2026Opened 10/5/2026

Delaware County·Pennsylvania

60% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

City of Lake Wales·Florida

60% match

RFP 27-02 GC Services for Kiwanis Park Loop Trail

Closes 11/4/2026Opened 9/30/2026

Georgia Cobb County Department of Transportation·Georgia

60% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Mississippi Department of Finance and Administration·Mississippi

60% match

MMNS Trail Repairs (GS# 610-015)

Closes 11/17/2026Opened 10/15/2026

Alaska Department of Transportation & Public Facilities·Alaska

60% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

Placer County·California

60% match

20693 - Olympic Valley Road Snow Removal

Closes 11/3/2026Opened 10/16/2026

City of Cincinnati·Ohio

60% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Gainesville - Procurement Division·Florida

60% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Washington Parks & Recreation Commission, State·Washington

60% match

Loup Loup South Summit Area Cross Country Trail Grooming

Closes 11/10/2026Opened 9/24/2026

Ohio Department of Natural Resources·Ohio

60% match

PWC Hocking Hills Winter Hike 2027 Busing

Closes 11/13/2026Opened 10/23/2026

Minnesota Department of Administration·Minnesota

60% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Kenosha County·Wisconsin

60% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Camden County·New Jersey

60% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

U.S. Department Of Transportation·Idaho

59% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 11/13/2026Opened 10/13/2026

Snohomish County PUD·Washington

59% match

PWC - Lake Stevens Circuit 12-124; Transmission and Distribution Line Clearance

Closes 11/12/2026Opened 10/29/2026

City of Green Bay·Wisconsin

59% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Shawnee·Kansas

59% match

Notice of Hearing - Shawnee Industrial Park - 18760 Johnson Drive

Closes 4/30/2032Opened 4/30/2024

Alaska Recreational Trails Program·Alaska

59% match

RTP Grant Application - Girdwood Beaver Pond Trail

Rolling / TBD closeOpened 9/24/2026

Maryland Department of Natural Resources·Maryland

59% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026