Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Purchase of Two (2) each Ground Power System (GPU)

U.S. Department Of Defense·U.S. Armed Forces – Pacific

Purchase of Two (2) each Ground Power System (GPU)

Closes 5/26/2026$200k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Air Force is seeking to purchase two Ground Power System (GPU) units with on-site training at USAG Japan Facilities in Japan. The contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials, and services for the purchase of two Static Frequency Converters (Unitron UFC-45M or equal). The contractor must deliver the products directly to Camp Zama, Japan, and provide on-site training and support during the warranty period. The selected contractor must also provide customs clearance procedures and all expenses related to on-site training, including accommodation and travel costs. Some key features of the required GPU include: * Minimum 45KVA solid-state power rating * AC output of 115/200V, 130 Max AMPS, 400Hz * DC output of 28.5VDC, minimum 600A peak, minimum 2000A * Input power of 208V to 240V * Compatible with UH-60L's, AH-64's, and HH-60's aircraft * On-site setup and training * On-site troubleshooting during the warranty period * Auto-calibration and software-based monitoring * Overload rating of up to 400% for one second

Attached files

Contact

Hiroko Takahashi

[email protected]

(814) 255-16120

Key dates

Opened
4/17/2026
Closes
5/26/2026
Duration
200 days

Last updated

Details

Type
Request for Quotation
Industry
Aerospace and Defense
NAICS
335312
Solicitation №
FA520926Q0022

Budget estimate

$200,000 – $500,000

The estimated budget for this opportunity is difficult to determine as the document does not provide a specific budget or price range. However, based on the complexity of the required equipment and the need for on-site training and support, the estimated budget could be in the range of $200,000 to $500,000. This estimate is influenced by the cost of similar equipment, the cost of on-site training and support, and the overall scope of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Pasadena·California

Top match · 66%

Grounding Switches 35kV

Closes 11/30/2026Opened 10/28/2026

Jacksonville Port Authority·Florida

66% match

The purchase of two (2) new-surplus CAT 270-3504 radiator assemblies

Rolling / TBD closeOpened 8/5/2026

U.S. Department Of Defense·Michigan

66% match

Ground Vehicle System Center (GVSC) Commercial Solutions Opening (CSO)

Closes 6/4/2029Opened 9/22/2026

Texas Comptroller Of Public Accounts·Texas

65% match

Emergency Ground Support Equipment Rental

Closes 11/5/2026Opened 9/21/2026

U.S. Department Of Defense·Maryland

65% match

Diesel Engine, Starter Motor, Magnetic Contactors, Powerpack & Alternators Supporting 800kW, 60 Hz DPGDS - Non-Commercial NSN's

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·Michigan

65% match

Ground Vehicle System Center (GVSC) Commercial Solutions Opening (CSO)

Closes 6/4/2029Opened 6/5/2024

U.S. Department Of Defense·United States of America

64% match

POWER SUPPLY

Closes 11/9/2026Opened 10/28/2026

Florida State University·Florida

64% match

Rotary Uninterruptible Power System

Closes 11/2/2026Opened 9/8/2026

Idaho Falls School District 91·Idaho

64% match

E-Rate Category 2 Uninterruptable Power Supply

Closes 11/19/2026Opened 10/29/2026

NYS Rochester-Genesee Reg. Transportation Authority·New York

64% match

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026

U.S. Department Of Defense·Oklahoma

64% match

Generator, Direct Cu

Closes 10/14/2027Opened 10/14/2026

National Aeronautics And Space Administration·United States of America

64% match

TECHNOLOGY TRANSFER OPPORTUNITY: Universal Power Converter for a Lunar Power Grid (LEW-TOPS-181)

Closes 8/24/2027Opened 8/24/2026

U.S. Department Of Defense·Ohio

64% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

Chelan County PUD·Washington

64% match

115 kV Circuit Breakers

Closes 11/5/2026Opened 9/29/2026

U.S. Department Of Defense·California

64% match

U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid

Closes 3/31/2027Opened 3/31/2026

City of Gainesville - Procurement Division·Florida

64% match

Guardian Fuel Technologies MOSS

Closes 11/2/2026Opened 10/26/2026

City of Hollywood·Florida

64% match

Meter Transmission Unit / VertexOne Consumer Portal

Closes 11/2/2026Opened 10/26/2026

National Aeronautics And Space Administration·Alabama

64% match

TECHNOLOGY TRANSFER OPPORTUNITY: Solid-State System Efficiently Generates Purified O2 (MSC-TOPS-148)

Closes 8/10/2027Opened 8/10/2026

U.S. Department Of Defense·United States of America

63% match

Power Supply Set

Closes 1/5/2027Opened 10/23/2026

U.S. Department Of The Interior·New Mexico

63% match

PURCHASE: FLEX COUPLED PUMP

Closes 11/3/2026Opened 10/28/2026

NYSERDA·New York

63% match

Grid Modernization Grid Enhancing Technologies

Closes 11/19/2029Opened 6/26/2026

Michigan Ingham Intermediate School District·Michigan

63% match

Ingham ISD - WTC PA System

Closes 11/3/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

63% match

POWER SUPPLY

Closes 11/2/2026Opened 10/30/2026

The City of Hamilton, OH·Ohio

63% match

26-39R Switchgear Purchase

Closes 11/13/2026Opened 10/30/2026

U.S. National Energy Technology Laboratory·United States of America

63% match

Grid Supply Chain Alternatives to Lead Energy Dominance (SCALED)

Closes 2/8/2027Opened 10/30/2026