The Ohio Department of Natural Resources is seeking a contractor to rehabilitate the revetment at East Harbor State Park, including demolition of existing structures, installation of new armor and toe stone, construction of ADA‑compliant concrete ramps and steps, and installation of park amenities such as shade sails, benches, grills, and landscaping. The project consists of a base scope valued at approximately $2.65 M with six optional alternates that could raise the total contract value to about $4.34 M. Bids are submitted electronically via BidExpress, and the contractor must comply with prevailing‑wage, EDGE participation, and SUB‑USE‑PREVENTION‑RECOVERY program requirements.
• Demolition, excavation, geotextile installation, and placement of limestone armor, toe, and splash‑apron stone.
• Cast‑in‑place concrete walkways, ramps, and steps meeting ADA standards.
• Installation of park furnishings (shade sails, handrails, benches, grills, bike racks) and planting of shade trees.
• Mandatory insurance, bond, and certification packages (Bid Security, Builder’s Risk, EDGE, SUPR, prevailing‑wage).
• Electronic bidding only; pre‑bid meeting scheduled for August 17, 2026.