The U.S. Fish and Wildlife Service (FWS) is soliciting proposals from qualified contractors to provide all labor, materials, equipment, supervision, transportation, and incidentals necessary to complete the Septic System Replacement project at Makah National Fish Hatchery, Washington. The work shall be performed in accordance with the Statement of Work (SOW), specifications, drawings, applicable wage determination, and all terms and conditions of this solicitation. The project includes tasks such as field report, design and permitting, installation, and replacement of tanks. The contractor shall begin performance within 10 days after notice to proceed and complete the work within 365 calendar days.
• The project requires the replacement of the septic system at the Makah National Fish Hatchery.
• The contractor shall provide all necessary labor, materials, equipment, and supervision.
• The project includes multiple tasks, including field report, design and permitting, installation, and replacement of tanks.
• The contractor shall comply with all applicable laws, regulations, and standards.
• The project has a fixed price contract type.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.