Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›178th Wing Base Microgrid Construction

U.S. Department Of Defense·Ohio

178th Wing Base Microgrid Construction

Closes 6/1/2026$5M – $10MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Ohio Air National Guard is seeking a contractor to construct a base-wide microgrid at the Springfield-Beckley Air National Guard Base in Ohio. The project includes the design, installation, and integration of a PV solar array, a battery electric storage system, two natural gas generators, and all associated controls, switchgear, and infrastructure. The contract will be a firm-fixed-price lump-sum contract awarded to the lowest responsive and responsible bidder. The project is set aside 100% for small businesses, and the magnitude of construction is estimated to be between $5,000,000 and $10,000,000. Key features of the project include: • The microgrid must be able to operate independently for extended periods in the event of a long-term utility outage. • The system must be compatible with the base's existing Direct Digital Controls (DDC) infrastructure. • The contractor must possess verified experience in power plant or power controls installation. • The contract duration will be 450 calendar days after notice to proceed, including inspection and punch list. • The solicitation will include two option line items: Option 001 for the installation of a solar PV array and associated infrastructure, and Option 002 for the installation of a battery energy storage system and associated infrastructure.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Carter Coleman

[email protected]

Key dates

Opened
5/15/2026
Site visit
6/26/2026
Closes
6/1/2026
Duration
450 days

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
237130
Solicitation №
WAAR209001

Budget estimate

$5,000,000 – $10,000,000

Based on the information provided, the estimated budget for this project is between $5,000,000 and $10,000,000. This estimate is influenced by the magnitude of construction, which is stated to be between $5,000,000 and $10,000,000. The actual budget may vary depending on the complexity of the project, the experience and qualifications of the contractor, and other factors.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·California

Top match · 69%

U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid

Closes 3/31/2027Opened 3/31/2026

U.S. Department Of Defense·Ohio

62% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

U.S. Department Of Defense·Ohio

61% match

Repair Electrical Systems

Closes 11/12/2026Opened 4/20/2026

U.S. Department Of Defense·United States of America

61% match

P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI

Closes 11/16/2026Opened 10/21/2026

U.S. Department Of Defense·Maine

61% match

Maine Air National Guard Fuel Cell Hangar (FCH), Project No. FKNN159044

Closes 12/1/2026Opened 9/21/2026

State of Delaware ARNG·Delaware

61% match

Biden Microgrid

Closes 11/10/2026Opened 9/22/2026

U.S. Department Of Defense·Michigan

60% match

Building 164 HVAC Repair

Closes 4/15/2027Opened 3/6/2026

Alabama United States Air Force·Alabama

60% match

McQuay Chiller Repair for 187th FW BLDG 1501

Closes 11/16/2026Opened 10/29/2026

U.S. Department Of Defense·Oklahoma

60% match

Generator, Direct Cu

Closes 10/14/2027Opened 10/14/2026

U.S. Department Of Defense·Ohio

60% match

Electricity 2027

Closes 11/9/2026Opened 10/6/2026

U.S. Department Of Defense·Washington

60% match

P-8A Ground Vibration Testing

Closes 11/16/2026Opened 10/30/2026

U.S. Department Of Energy·Illinois

59% match

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Closes 12/17/2026Opened 10/6/2026

U.S. Department Of Defense·Texas

59% match

MACH-1 Modernized Agile Construction Horizons

Closes 9/1/2032Opened 8/3/2026

U.S. Department Of Defense·Texas

59% match

Sources Sought -Building 493 Generator and Backup Power Installation- Red River Army Depot

Closes 11/13/2026Opened 10/18/2026

U.S. Department Of Defense·Oklahoma

59% match

F-16 GENERATOR,ALTERNATI

Closes 11/30/2026Opened 10/15/2026

U.S. Department Of Defense·Utah

59% match

F-16 Wheel Housing Section

Closes 11/6/2026Opened 10/2/2026

U.S. Department Of Defense·California

59% match

MACH1_AOI_Military Working Dog Facility_ Vandenberg Space Force_LOE 1 and LOE 2

Closes 11/17/2026Opened 10/20/2026

U.S. Department Of Defense·Oklahoma

59% match

FMS SUPPORT TURBINE

Closes 11/8/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

59% match

FUEL CELL,AIRCRAFT

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·Oklahoma

59% match

New Manufacture: B-2 Power Supply, NSN 6130012631583FW

Closes 11/23/2026Opened 10/7/2026

U.S. Department Of Defense·Oklahoma

59% match

F16_Panel_Distribution_NSN6110012758549_PN16E2504841

Closes 12/14/2027Opened 12/29/2025

U.S. Department Of Defense·District of Columbia

59% match

Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)

Closes 11/30/2026Opened 10/23/2026

U.S. Department Of Defense·Georgia

59% match

FUEL CELL,AIRCRAFT,

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·Washington

59% match

Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3223 and 3224

Closes 11/13/2026Opened 9/16/2026

U.S. Department Of Defense·Utah

59% match

F-16 Wheel Housing Section

Closes 11/6/2026Opened 9/29/2026