The Stockton Unified School District is soliciting a fixed‑price, lump‑sum construction contract to modernize its musical instrument repair and storage facility at 349 E. Vine St., Stockton. The scope includes demolition of existing portable structures, renovation of six portable classrooms and one larger building, installation of new flooring, ceilings, paint, accessible restroom, roll‑up doors, metal ramps, compressed‑air system, electrical and low‑voltage systems, a metal canopy, and extensive site work such as asphalt paving, utility upgrades, fencing, and accessible parking. Addendum #1 adds requirements for hazardous‑material allowance, equipment relocation, PVC pipe removal, and fire‑alarm panel cross‑tripping. Bids are sealed and opened on February 3 2026, with a contract time of 114 calendar days.
• Modernize 7 portable buildings for music program use (flooring, ceilings, paint, utilities).
• Site‑work package: asphalt replacement, utility installation, fencing, accessible parking, drainage.
• Specialized items: new restroom (ADA), paint booth, air‑compressor system, shade structure, equipment relocation, hazardous‑material abatement allowance.