The Royal Oak Schools is seeking a contractor to replace the swimming blocks at Royal Oak Middle School. The project includes the removal and disposal of 8 existing swimming blocks, provision of 8 new swimming blocks, and installation of 9 Colorado backstroke start devices with automatic recoil. The contractor must also provide all necessary training and ensure that the equipment and pool bonding comply with local, state, and federal code requirements. The project duration is approximately 3 days, within 5 days after receipt of materials, with an overall project timeline of 10 to 12 weeks after shop drawing return. The contractor must submit a proposal that includes a detailed list of exceptions to the RFP and/or contract, references, evidence of ability to provide adequate insurance coverages, and a completed Proposal Pricing Form.
• The project requires compliance with World Aquatics, USA Swimming, NCAA, and NFHS regulations.
• The contractor must provide a Familial Disclosure Affidavit and an Iran Economic Sanctions Act Affidavit of Compliance.
• The contractor must maintain worker's compensation insurance, comprehensive general liability insurance, and automobile liability insurance.
• The contractor must indemnify, defend, and hold harmless the School District from any claims, counterclaims, suits, debts, demands, actions, judgments, liens, costs, expenses, damages, injuries, and liabilities arising out of or in connection with the contract.