Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›Partial Discharge Testing

Corrections and Community Supervision, NYS Dept. of·New York

Partial Discharge Testing

Closes 7/6/2026$200k – $500kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

OVERVIEW: The facility is powered via two (2) incoming 13.2kV Utility electrical services. The incoming switchboard consists of (13) Eaton VCP-W vacuum circuit breakers. Protection is provided via (13) Eaton FP-5000 protective relays. Backup Power is provided by (2) 13.2kV generators. The generator switchboard consists of (4) 13.2kV Square D Type VR vacuum circuit breakers. Protective relays consist of (4) General Electric Type 489 relays and (3) General Electric Type PQMII Meters. There are two (2) Battery Systems: 48V Battery System: (38) ALCAD HC-11 OP Ni-Cad. 125V Battery System: (92) GA2 KM 140P Ni-Cad. (26) Pad mounted switchgear. (9) Non-automatic transfer switches. 21+ number of electrical manholes. All equipment is to be serviced using this listed scope of work. Contractor to provide generators and connect to critical buildings to maintain power during service, may have to be done during off hours. To be coordinated by the facility. Install UL listed Infra-Red windows in the incoming switchgear cabinets. All work must be bid using prevailing wage rate. ARC FLASH SAFETY AWARENESS TRAINING · Provide a one-time Arc Flash Safety Awareness Training in accordance with OSHA and NFPA 70E 2024 version for up to 20 persons. · A minimum of 6 hours training is required. · Certificates will be provided by the Contractor. The training should include materials for the trainees (PowerPoint /manual, tests, training aids, etc.). · Training cost shall be invoiced separately from Switchgear Testing costs. PORTABLE GENERATOR CONNECTION TRAINING · Provide a one-time portable generator connection training · Provide instruction on reading arc flash labels and the use of proper PPE. · Minimum 4 hours · The facility will provide a generator and transformer for the training. · The training should include materials for the trainees (PowerPoint /manual, tests, training aids, etc.). · Training cost shall be invoiced separately from Switchgear Testing costs. SERVICE AND TESTING OF MEDIUM VOLTAGE SWITCHGEAR & TRANSFER SWITCHES General service and testing include cleaning, adjustment, inspection, lubrication, minor repairs and electrical testing as applicable. · Arc chutes removed, cleaned and inspected. · Arcing and main contacts cleaned, inspected and adjusted. · All insulated components inspected and cleaned with approved solvents and methods. · Fuse holders inspected for proper support and mechanical connections. · Entire unit cleaned and inspected for loose hardware. · All mechanisms, rollers, latches, etc. inspected and lubricated as appropriate. · All cubicles vacuum cleaned and inspected. Mechanical linkages, hinges, etc. inspected and lubricated. · All electrical and mechanical interlock systems tested for proper operation and sequencing. · All mechanical operational tests performed per manufacturer's recommendations · All indicating devices checked for proper operation. · Contact resistance measurements performed. · Insulation resistance measurements performed. · High potential tests performed where applicable. · All results submitted in formal bound report. SERVICE AND TESTING OF AUTOMATIC TRANSFER SWITCHES · Secure and lockout normal and emergency disconnects. · Remove all arc chutes and pole covers. · Test and re-calibrate all trip sensing and time delay functions. · Vacuum clean switchgear and all accessory panels. · Clean any grime with an approved solvent. · Clean and lubricate TS coil and operator linkage. · Inspect all insulating parts for cracks or discoloration. · Inspect all main and arcing contacts pitting and wear. · Inspect all control relay contacts for excessive erosion and discoloration due to excessive heat · Inspect and clean all add-on panels and accessories · Manually operate to check proper alignment, deflection, gap, and wiping action and control contact operation. · Check all wire connections to transfer switch control, sensing panel and other system components, tighten if necessary. · Electrically test all power sensing and time delay devices and adjust as necessary. · Reconnect engine start. · Re-energize the switchgear and conduct a test by simulating a normal source failure. · All results will be submitted in a formal bound report. SERVICE AND TESTING OF MEDIUM VOLTAGE VACUUM CIRCUIT BREAKERS General service and testing includes cleaning, adjustment, inspection, lubrication, minor repairs and electrical testing as applicable. · Main contact wear indicators checked for proper dimensions. · All insulated components inspected and cleaned with approved solvents and methods. · Entire unit cleaned and inspected for loose hardware · All mechanisms, rollers, latches, etc. inspected and lubricated as appropriate. · Control wiring inspected for insulation damage and loose connections. · Primary fingers inspected, cleaned and lubricated per manufactures recommendations. · All cubicles vacuum cleaned and inspected. Mechanical linkages, hinges, etc. inspected and lubricated. · Racking mechanisms adjusted and checked for proper operation · Cell fit and element alignment inspected and adjusted. · Primary and secondary contact wipe adjusted as necessary. · Shutter mechanism operation verified. · Contact resistance measurements performed. · Insulation resistance measurements performed. · High potential tests performed per manufacturer's recommendations. · All serviced breakers electrically operated on both test stand and in respective cubicle prior to be returned to service where applicable. · All results submitted in formal bound report. SERVICE AND TESTING OF BATTERY SYSTEMS General service and testing include cleaning, inspection, minor repairs and electrical testing as applicable. Specific work includes: · Inspect for physical damage and proper anchorage of system. · Visually inspect each cell, battery rack and charger. · All indicating devices checked for proper operation. · Check tightness of all electrical connections. · Clean all cells, racks and charger · All insulated components inspected and cleaned. · Record all nameplate data from batteries and charger. · Clean entire charger and inspect for loose hardware or connections. · Measure float voltage at each battery terminal. · Perform battery impedance test. · Measure intercell connection resistance. · Measure specific gravity of electrolyte of each cell where applicable. · Verify proper float and equalize charge voltages. Adjust if necessary. · Apply equalization charge if required. · All results submitted in formal bound report. SERVICE AND TESTING OF MOTOR CONTROL CENTERS General service and testing include cleaning, adjustment, inspection, lubrication, minor repairs and electrical testing as applicable. Specific work includes: · Inspect for physical damage, proper anchorage, and grounding. · Check tightness of all electrical connections. · All insulated components inspected and -cleaned. · Fuse holders inspected for proper support and mechanical connections. · Entire unit cleaned and inspected for loose hardware. · Mechanisms, rollers, latches, etc. inspected and lubricated as appropriate. · Mechanical linkages, hinges, etc. inspected and lubricated. · All indicating devices checked for proper operation. · Motor overload relay elements tested by injecting primary current through overload unit and monitoring trip times when applicable. · Contactor coil resistance measurements performed. · Contactor will be dissembled, inspected, contacts cleaned and burnished if required. · Contactor electrical operation verified. · Auxiliary contacts checked for proper operation. · Control power transformer tested for proper output voltage. · Contact resistance measurements performed. · Insulation resistance measurements performed · All results submitted in formal bound report. SERVICE AND TESTING OF OIL FILLED TRANSFORMERS · Unit visually inspected for physical damage, leaks and mechanical condition. · Unit inspected for cracked insulators, tightness of connections, defective wiring, and general mechanical and electrical condition. · All insulated components inspected and cleaned with approved solvents and methods. · Verify correct liquid level and positive blanket pressure where applicable. · Bolted connections torqued where accessible. · Proper core and equipment grounding verified. · Contact resistance measurements performed where applicable. · Auxiliary devices checked for proper operation. · Insulation resistance measurements performed. · Turns Ratio tests performed. · Transformer oil samples to be taken for analysis. · All results submitted in formal bound report. SERVICE AND TESTING OF DRY TYPE TRANSFORMERS General service and testing includes cleaning, inspection, torqueing, minor repairs, and electrical testing as applicable. Specific work includes: · Covers removed and unit visually inspected for physical damage. · Unit inspected for cracked insulators, tightness of connections, defective wiring, and general mechanical and electrical condition. · All insulated components inspected and cleaned with approved solvents and methods. · Entire unit cleaned and inspected for loose hardware. · Bolted connections torqued where accessible. · Proper core and equipment grounding verified. · Contact resistance measurements performed where applicable. · Auxiliary devices checked for proper operation. · Insulation resistance measurements performed. · Turns Ratio tests performed. · All results submitted in formal bound report. SERVICE AND TESTING OF LOW VOLTAGE AIR SWITCHES General service and testing include cleaning, adjustment, inspection, lubrication, minor repairs and electrical testing as applicable. Specific work includes: · Arc chutes removed, cleaned and inspected. · Arcing and main contacts cleaned, inspected and adjusted. · All insulated components inspected and cleaned with approved solvents and methods. · Fuse holders inspected for proper support and mechanical connections. · Entire unit cleaned and inspected for loose hardware. · All mechanisms, rollers, latches, etc. inspected and lubricated as appropriate. · All cubicles vacuum cleaned and inspected. Mechanical linkages, hinges, etc. inspected and lubricated. · All electrical and mechanical interlock systems tested for proper operation and sequencing. · All mechanical operational tests performed per manufacturer's recommendations. · All indicating devices checked for proper operation. · Contact resistance measurements performed. · Insulation resistance measurements performed. · All results submitted in formal bound report. TESTING AND CALIBRATION OF PROTECTIVE RELAYS General service testing and calibration includes cleaning, adjustment, inspection, calibration, minor repairs, and electrical testing as applicable. Specific work includes: · Protective relays removed one at a time. · Relays inspected for physical damage. · Cover gasket, glass and case cleaned and inspected for physical damage, foreign material, and moisture. · Inspect condition of spiral spring, disc clearance and contacts. · Check mechanical relays for freedom of movement, proper travel, and alignment. · Clean and adjust contacts where applicable. · Inspect control wiring for damage and loose connections. · Insulation resistance measurements performed on control wiring (Not applicable to solid state relays). · Determine pick-up parameters for each operating element. · Timing tests performed at three (3) test points. · Pick-up target and seal-in units checked for proper operation. · Special tests as required to check proper operation of restraint, directional, differential and other elements per manufacturer's recommendations or instructions. · Operational trip tests performed on the system as applicable. · All results submitted in formal bound report. PARTIAL DISCHARGE TESTING Partial Discharge Testing of its medium voltage primary cables, terminations, splices, and connected equipment using Doble Online PD Testing System. DOCCS will require 2 copies of the engineered report with risk category evaluation. A one-line diagram will be provided for viewing at the site visit. A copy of the one line will be provided to the winning bidder. A power distribution diagram will be available for viewing at the site visit. A power distribution diagram will be provided to the winning bidder. The electrical manhole covers are welded for security purposes. The manhole covers will be removed and replaced daily by the facility. Pumping water from the manholes, if necessary, will be the responsibility of the contractor. Partial Discharge Testing is to be completed prior to the switchgear testing to allow deenergized repairs to be made (if necessary) during the switchgear maintenance Business enterprises awarded an identical or substantially similar procurement contract within the past five years: NONE Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 0.00% WBE Goal: 0.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michelle Thompson(Steward)

[email protected]

(585) 658-2871 ext. 3100

Key dates

Opened
6/3/2026
Closes
7/6/2026
Duration
18 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238210
Solicitation №
TBD

Budget estimate

$200,000 – $500,000

The budget for this opportunity is likely to be in the range of $200,000 to $500,000, based on the scope of work and the fact that it involves testing and maintenance of medium voltage electrical equipment. The contractor will need to provide specialized equipment and personnel, which will increase the cost. Additionally, the contractor will need to provide training and submit a formal bound report, which will also add to the cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The Housing Authority of Columbus·Georgia

Top match · 64%

Back Flow Testing

Closes 11/6/2026Opened 10/8/2026

Corrections and Community Supervision, NYS Dept. of·New York

64% match

Electrical switchgear maintenance and Partial discharge testing

Closes 11/18/2026Opened 7/28/2026

Maryland Washington Suburban Sanitary Commission·Maryland

63% match

Fire Flow Testing Services

Closes 11/30/2026Opened 10/29/2026

Corrections and Community Supervision, NYS Dept. of·New York

63% match

Electrical Switchgear Testing Washington Correctional

Closes 1/7/2027Opened 9/18/2026

Corrections and Community Supervision, NYS Dept. of·New York

63% match

Switchgear Cleaning/Testing and Partial Discharge Testing

Closes 11/4/2026Opened 9/1/2026

U.S. Department Of Defense·Massachusetts

62% match

Individual Water Treatment Device (IWTD) Laboratory Testing

Closes 11/12/2026Opened 10/8/2026

LA Water & Power·California

61% match

90925 Aboveground Storage Tank Corrosion & Integrity Testing Services

Closes 12/9/2026Opened 10/27/2026

Washington Suburban Sanitary Commission, MD·Maryland

61% match

Fire Flow Testing Services

Closes 11/30/2026Opened 10/28/2026

Ohio Department of Rehabilitation and Correction·Ohio

60% match

Water Testing Services - CCI - DRC27

Closes 11/9/2026Opened 10/19/2026

U.S. Department Of Homeland Security·United States of America

60% match

TSA Third Party Testing Framework

Closes 12/31/2028Opened 5/7/2026

U.S. Department Of Transportation·Massachusetts

60% match

Laboratory Capabilities to Test Railroad Tank Car Thermal Protection Systems (TPS)

Closes 11/20/2026Opened 10/19/2026

U.S. Department Of Defense·Indiana

60% match

ENVIRONMENTAL QUALIFICATION TESTING (EQT)

Closes 11/18/2026Opened 10/29/2026

Loudoun Water·Virginia

59% match

Cathodic Protection Testing Services

Closes 11/20/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

59% match

TEST KIT, LP

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·New Jersey

59% match

Aircraft Pressurized Cabin Leakage Tester (APCLT)

Closes 11/12/2026Opened 10/20/2026

LA County Parks and Recreation·California

59% match

Fuel Tank Testing, Inspecting, and Maintenance Services

Rolling / TBD closeOpened 8/17/2017

U.S. Department Of Veterans Affairs·Indiana

59% match

B533--VANIHCS SPS Water Testing (VA-27-00000760)

Closes 11/4/2026Opened 10/4/2026

U.S. Department Of Transportation·District of Columbia

59% match

Full Scale Vehicle Crashworthiness Testing and Side Air Bag Out-of-Position Testing for the New Car Assessment Program (NCAP)

Closes 11/2/2026Opened 10/20/2026

Washington Suburban Sanitary Commission·Maryland

59% match

Fire Flow Testing Services

Closes 11/30/2026Opened 10/30/2026

Catalina Foothills Unified School District·Arizona

59% match

IFB 27-03-32 BACKFLOW-TESTING-MANAGEMENT

Closes 11/5/2026Opened 10/10/2026

U.S. Department Of Defense·United States of America

59% match

TEST SET,PNEUMATIC

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Veterans Affairs·West Virginia

59% match

Z1NE--RFQ Semi Annual Industrial Wastewater Discharge Testing Huntington VAMC Base Year Plus Four Option Years

Closes 11/16/2026Opened 10/19/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

59% match

Polygraph Tests for Police

Closes 11/6/2026Opened 10/31/2026

U.S. Department Of Defense·United States of America

59% match

TEST SET, SURGE PRO

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of State·District of Columbia

59% match

Updated List of Approved Labs to Conduct SD-STD-01.01 Forced Entry and Ballistic Resistance (FE/BR) Certification Testing

Closes 4/13/2027Opened 4/13/2026