Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›Runway 2-20 Rehabilitation - HFD

Connecticut Airport Authority·Connecticut

Runway 2-20 Rehabilitation - HFD

Closes 4/21/2026$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the rehabilitation of Runway 2-20 at the Hartford-Brainard Airport. The scope of work includes a 4-inch mill and overlay of the existing pavement, runway safety area grading, miscellaneous airfield drainage and runway electrical improvements, and plant transplanting within select work areas. The project also includes the removal and replacement of runway edge lights, threshold lights, guidance signs, and distance remaining signs. The electrical work includes the removal and replacement of the regulator serving Runway 2-20. • The project requires the use of heavy construction machinery and equipment. • The project involves land preparation services, including earth moving and grading. • The project requires the use of specialized materials, such as bituminous pavements and concrete. • The project involves electrical work, including the removal and replacement of lighting and signage. • The project requires the use of specialized labor, including heavy equipment operators and electricians.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kevin Lynch

[email protected]

Key dates

Opened
3/25/2026
Closes
4/21/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237000
Solicitation №
IFB No. 2026-018

Budget estimate

$1,000,000 – $5,000,000

The budget for this project can be estimated to be in the range of $1 million to $5 million, based on the scope of work and the materials required. The project involves the rehabilitation of a runway, which requires significant amounts of materials, labor, and equipment. The cost of the materials, including bituminous pavements and concrete, can be estimated to be around $500,000 to $2 million. The cost of labor, including heavy equipment operators and electricians, can be estimated to be around $200,000 to $1 million. The cost of equipment, including heavy construction machinery, can be estimated to be around $100,000 to $500,000. Additionally, the cost of permits, inspections, and other miscellaneous expenses can be estimated to be around $50,000 to $200,000. Therefore, the total budget for the project can be estimated to be around $1 million to $5 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS Niagara Frontier Transportation Authority·New York

Top match · 67%

NFIA – Runway 10-28 Rehabilitation (Designs)

Closes 11/3/2026Opened 10/2/2026

Port of Portland·Oregon

67% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Raleigh Durham Airport Authority·North Carolina

66% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Delta Airport Consultants·Virginia

66% match

COMING SOON - Roanoke, VA - Roanoke-Blacksburg Reg. Airport - Rehabilitate Runway 6-24 (24072)

Rolling / TBD closeOpened 5/1/2026

City of Charlotte·North Carolina

65% match

Runway 18/36 and Taxiway Delta Rehab Construction

Rolling / TBD closeOpened 12/14/2026

Delta Airport Consultants·Pennsylvania

64% match

COMING SOON - Tobyhanna, PA - Pocono Mtns. Reg. Airport - Rehabilitate Runway 5-23 (24084)

Rolling / TBD closeOpened 3/1/2026

Hawaii Department of Transportation·Hawaii

63% match

HDH - Tie-Down Improvements

Closes 11/29/2026Opened 10/15/2026

Raleigh Durham Airport Authority·North Carolina

63% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

Tampa International Airport·Florida

63% match

General Aviation Apron Rehabilitation

Closes 11/16/2026Opened 9/30/2026

City of Charlotte·North Carolina

63% match

FBO Apron Expansion & Rehab

Rolling / TBD closeOpened 10/13/2026

Little Rock Municipal Airport Commission·Arkansas

62% match

4R-22L RUNWAY AND TAXIWAY LIGHTING REHABILITATION

Closes 11/18/2026Opened 10/11/2026

U.S. Department Of Defense·Massachusetts

62% match

Hanscom Aero Club Automated Fuel Management System Replacement

Closes 11/6/2026Opened 10/16/2026

Los Angeles County·California

62% match

FDC-HELICOPTER2026 - Helicopter Maintenance, Engineering, Repair and Completion Services - Closing: Continuous

Closes 2/18/2028Opened 2/18/2026

U.S. Department Of Defense·Georgia

62% match

Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)

Closes 11/25/2026Opened 4/29/2026

U.S. Department Of Defense·Pennsylvania

62% match

FMS Repair for NIIN 012653659

Closes 11/5/2026Opened 10/6/2026

City of Mankato·Kansas

62% match

Mankato Airport (TKO) | 24434

Closes 11/19/2026Opened 10/31/2026

City of Torrance·California

62% match

Engineering Design Services for the Torrance Airport Zamperini Field Runway 11L-29R, I-126

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Defense·Georgia

62% match

Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)

Closes 11/25/2026Opened 9/29/2026

Hillsborough County Aviation Authority·Florida

62% match

GENERAL AVIATION APRON REHABILITATION (TPA)

Closes 11/16/2026Opened 9/29/2026

U.S. Department Of Defense·Utah

62% match

F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah

Closes 11/12/2026Opened 10/21/2026

City of Broken Arrow·Oklahoma

62% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

Raleigh Durham Airport Authority·North Carolina

62% match

Taxiway F Pavement Repairs - 2026

Closes 11/9/2026Opened 10/8/2026

Los Angeles County·California

62% match

FDC-HEMARS2027 - Heavy Equipment Maintenance and Repair Services - Closing: 11/17/2026 1:00 PM

Closes 11/17/2026Opened 10/19/2026

U.S. Department Of Defense·North Carolina

62% match

Airborne Special Operations Testing Directorate Wet Blade Hours IDIQ

Closes 11/2/2026Opened 10/19/2026

U.S. Department Of Transportation·Oklahoma

62% match

Spin and Spin Recovery Training

Closes 11/27/2026Opened 10/29/2026