Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Nisqually Rd SW (Nisqually River to I-5 Northbound Ramp)…

Pierce County·Washington

Nisqually Rd SW (Nisqually River to I-5 Northbound Ramp). CRP 5962

Closes 9/30/2026$2M – $5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks qualified contractors to perform a comprehensive improvement of Nisqually Road Southwest between the Nisqually River and the I‑5 northbound ramp in Pierce County, Washington. The scope includes: • Resurfacing existing asphalt pavement and paved shoulder. • Removing and replacing substandard guardrail with new guardrail systems. • Grading, excavation, and installation of base and top asphalt courses. • Installation of erosion control measures, roadside planting, and related environmental protections. • Full traffic control planning, including temporary signage, flaggers, and work‑zone safety provisions. • Provision of required plans (SPCC, FDC) and compliance with federal‑aid construction specifications. • Submission of a bid bond (5 % of total bid) and adherence to wage‑law, non‑segregated‑facility, and anti‑collusion certifications. The project is funded under Federal Aid (STBGR‑G273) and will be awarded to the lowest responsive bidder meeting all specifications.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Dalton Gamboa(Director of Planning & Public Works)

[email protected]

(253) 798-2904

Key dates

Opened
9/2/2026
Questions due
9/24/2026
Closes
9/30/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
2026-MPW-210

Budget estimate

$2,000,000 – $5,000,000

Based on typical Washington State highway resurfacing costs (approximately $1‑$2 million per lane‑mile) and assuming the project length is roughly 2‑3 miles with a standard two‑lane cross‑section, the total construction value is likely in the $2 million to $5 million range. This estimate accounts for asphalt, guardrail, traffic control, erosion control, and overhead (bond, insurance, and administrative costs).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

West County Wastewater·California

Top match · 66%

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

Minnesota Department of Administration·Minnesota

64% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

County of El Dorado·California

64% match

RFP - Environmental Planning Services for the Grizzly Flat Road at Steely Fork Cosumnes River - Bridge Replacement Project #36105085

Closes 11/24/2026Opened 10/21/2026

California Department of Transportation·California

64% match

Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting.

Closes 11/17/2026Opened 9/28/2026

Maryland Transportation Authority·Maryland

64% match

I-95 / I-695 INTERCHANGE EXPRESS TOLL LANES – RAMPS MB & MH

Closes 1/13/2027Opened 10/10/2025

Idaho Transportation Department·Idaho

64% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

Camden County·New Jersey

63% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Fargo·North Dakota

63% match

City of Fargo RFP - Engineering Services: Project No. SR-28-A0 Project No. SN-28-A0 Project No. SN-29-A0

Closes 11/13/2026Opened 10/17/2026

Missouri Department of Transportation·Missouri

63% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026

Delaware Valley Regional Planning Commission·Pennsylvania

63% match

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026

NYS Niagara County·New York

63% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

Maryland Town of Port Deposit·Maryland

63% match

RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements

Closes 11/16/2026Opened 10/16/2026

Minnesota Department of Transportation·Minnesota

63% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Pulaski County Comptroller’s Office·Arkansas

63% match

RIVER PORT ROAD PHASE II

Rolling / TBD closeOpened 8/23/2026

City of Cincinnati·Ohio

63% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Columbus·Ohio

63% match

Roadway - N Knot - 315 at Lane Avenue

Closes 11/4/2026Opened 10/2/2026

The City of Columbus·Ohio

63% match

RFQ033860 - Olentangy River Rd/Snouffer Rd Home Sewage Treatment System

Closes 11/13/2026Opened 10/13/2026