The project involves the rehabilitation of the Cleetwood Trail and Marina Improvements at Crater Lake National Park in Oregon. The work includes aggregate base trail reconstruction, slope stabilization, slope protection, walls, reconstruction of the marina with a floating dock system, and other related tasks. The project is expected to be completed in Fall 2027, and the estimated price range is between $30,000,000 and $40,000,000. The contract type is Negotiated, Firm-Fixed-Price, with a base and four options.
• The project requires the removal and replacement of the failed bulkhead/dock with a structurally stable marina.
• The project involves the replacement of the outdated and undersized composting toilets located near the marina.
• The project requires the replacement of the temporary concessionaire booth with a permanent structure.
• The project involves rockfall scaling and mitigation along identified high-risk zones.
• The project requires the rehabilitation of the entire 1.1-mile trail, including improvements to trail tread and retaining walls.