The U.S. Army Corps of Engineers Seattle District (USACE) is issuing a notice of intent to use brand name or equal descriptions for the construction of a hydrant fueling facility at Fairchild Air National Guard Base in Washington. The project requires the use of Alerton building automation direct digital control (DDC) equipment, including global controllers and Programmable Logic Controllers (PLC) for the Energy Management Control System (EMCS). The justification for this requirement is that Fairchild AFB currently uses the Alerton DDC system for centralized management of facility systems, and using a different system would result in substantial duplication of costs. Interested parties may submit a capability statement to the point of contact listed in the notice.
• The project involves the construction of a hydrant fueling facility at Fairchild ANG, WA.
• The facility must link to the current centralized management system at Fairchild without the need for adaptive software or additional equipment.
• The Alerton DDC system is currently used at Fairchild AFB for centralized management of facility systems.
• Compatible systems must comply with Provision 52.225-12 and Clause 52.225-11.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.