The National Training Center (NTC) requires a comprehensive leasing service for one commercial, portable solar generator to support sustained, critical operational requirements at Bicycle Lake Army Airfield (BLAAF), a remote, off-grid location at Fort Irwin. The service is not for a product purchase but for a turn-key power solution, ensuring a reliable, stand-alone power source for a 12-month period. The leased unit must deliver a minimum continuous power output of 10kW and include an integrated propane-fueled secondary power source to guarantee 100% operational continuity.
• The solar generator system must meet specific performance and durability requirements, including a solar capacity of 2.88kW, a solar charge controller of 150V/60A Victron MPPT x 2, an inverter/charger system of 240VAC/48VDC/6000W, and a lithium iron phosphate (LiFePO4) battery type with a nominal battery capacity of 800Ah.
• The system must be skid-mounted or wheel-mounted, capable of 24/7 operations, and have posted operating instructions in the vicinity of the control panel.
• The contractor is responsible for delivery, installation, maintenance, and removal of the solar generator system.
• The period of performance is from 16 June 2026 to 15 June 2027.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.