Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Georgia
  4. ›Construction
  5. ›RFP2026-113 Solar Installation on Tybee Island Marine…

Georgia City of Tybee Island·Georgia

RFP2026-113 Solar Installation on Tybee Island Marine Science Center

Closes in 2 days$100k – $200kRequest for Proposal
Get bids like this by emailBid source

Description

The City of Tybee Island is soliciting qualified contractors to design, supply, and install a 42 kW photovoltaic solar array on the flat roof of the Marine Science Center (approximately 40 ft × 80 ft). The project requires UL‑certified PV modules (Q‑Cell, USA‑made) and SMA Sunny Boy string inverters, installation on an existing TPO roof without voiding the warranty, compliance with wind‑loading (141 mph) and all applicable building codes, and provision of a one‑year warranty, production monitoring, and detailed documentation. The contractor must coordinate with GAF for roof‑warranty amendment, use GAF‑certified mounting systems (OMG Power Grip System Plus, Polar Bear III HD), and handle all permitting, inspections, and grid interconnection (240 V single‑phase). Submissions are due Nov 3, 2026, with an optional pre‑proposal meeting on Oct 13, 2026. • Minimum system size: 42 kW (≈ 105 panels @ 400 W each) • Roof dimensions: 40 ft × 80 ft, TPO roof (GAF) • Required inverters: SMA Sunny Boy (string) • Required modules: Q‑Cell, UL‑listed, made in USA • Warranty: 1‑year on all components & workmanship • Documentation: production monitoring, MWh annual generation estimate, three references for marine‑environment installations • Permit & inspection fees: $600 pre‑inspection, $600 post‑inspection (to be included in bid) • Delivery & installation schedule to be proposed • All work must meet city, county, state, and federal regulations, including E‑Verify and SAVE program compliance.

Attached files

Contact

Aleesha Robinson(Buyer)

[email protected]

(912) 760-4368

Key dates

Opened
10/3/2026
Pre-bid meeting
10/13/2026
Closes
11/3/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238210
Solicitation №
2026-113

Budget estimate

$100,000 – $200,000

No contract value is disclosed. A 42 kW solar PV system in the Southeast typically costs between $2.5 kW⁻¹ and $3.5 kW⁻¹ when including equipment, mounting, permitting, and labor. Applying that range yields an estimated total contract value of roughly $105,000 – $147,000. Accounting for additional warranty, inspection fees, and potential contingencies, a reasonable bid range would be $100,000 to $200,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

North Carolina Mecklenburg County·North Carolina

Top match · 83%

Bette Rae Thomas Recreation Center PV Panel Installation

Closes 11/24/2026Opened 10/29/2026

Maryland Wicomico County Board of Education·Maryland

82% match

BENNETT MIDDLE SCHOOL SOLAR POWER SYSTEM PROJECT

Closes 11/12/2026Opened 10/13/2026

Connecticut City of Stamford·Connecticut

81% match

City Design Build RFP –Terry Conners Ice Rink Solar Photovoltaic (PV) & Battery

Closes 12/17/2026Opened 10/22/2026

Town of York, Maine·Maine

80% match

RFI / RFQ for Witchtrot Landfill Solar Photovoltaic Project

Closes 12/1/2026Opened 11/6/2025

City and County of Butte-Silver Bow·Montana

80% match

Butte-Silver Bow Library Solar Project

Closes 11/10/2026Opened 10/22/2026

Marinette County·Wisconsin

79% match

RFB #26-015-34 - Law Enforcement Center Roof Replacement

Closes 11/16/2026Opened 9/29/2026

County of Kauai·Hawaii

79% match

Kealaula Supportive Housing Phase II Photovoltaic Design Build Project

Closes 11/30/2026Opened 10/23/2026

North Carolina UNC - System Office Design/Construction·North Carolina

79% match

UNC-Chapel Hill

Closes 11/3/2026Opened 10/8/2026

State of Delaware NAT·Delaware

79% match

Low to Moderate Income Solar Program Participating Contractors

Closes 11/19/2026Opened 10/15/2026

New York State Energy Research and Development Authority·New York

79% match

NY-Sun Residential/Nonresidential Incentive Program

Closes 12/31/2030Opened 6/7/2022

California Department of General Services·California

78% match

Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies

Closes 12/23/2026Opened 10/6/2026

U.S. Department Of Energy·New Jersey

78% match

RF Roof Replacement Project

Closes 12/10/2026Opened 10/30/2026

New York State Energy Research and Development Authority·New York

78% match

NY-Sun Commercial / Industrial Incentive Program

Closes 12/31/2030Opened 6/7/2022

Commonwealth of Kentucky·Kentucky

78% match

Solar Highway Lighting - FEDERAL

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Veterans Affairs·Washington

78% match

5650--American Lake B81 Lab Roof

Closes 11/1/2026Opened 9/2/2026

Port of Stockton·California

78% match

EPA Customer Side Design & Engineering

Closes 11/12/2026Opened 10/8/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

78% match

Engineer and Construct a Renewably Powered Battery-Coupled DC Fast Charging Network for the GVI, USV

Closes 11/5/2026Opened 10/7/2026

U.S. Department Of Veterans Affairs·Washington

78% match

5650--American Lake B81 Lab Roof

Closes 11/1/2026Opened 9/2/2026

Georgia Mitchell County Board of Commissioners·Georgia

78% match

Jail Roof Replacement

Closes 11/12/2026Opened 10/29/2026

Louisiana City of New Orleans·Louisiana

78% match

Solar Development - Agriculture ST.

Closes 11/11/2026Opened 10/23/2026

Northeast Wisconsin Technical College·Wisconsin

77% match

Green Bay Campus Rooftop Solar

Closes 11/3/2026Opened 10/12/2026

City of Hialeah, FL·Florida

77% match

SHIP Program Oswaldo Ramos - Roof Replacement

Closes 11/27/2026Opened 10/30/2026

U.S. Department Of Defense·California

77% match

U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid

Closes 3/31/2027Opened 3/31/2026

State of Hawaii Department of Transportation – Harbors Division·Hawaii

77% match

DOT-HAR-E-27-2 Commercial Harbor Cargo Yard Lighting Maintenance

Closes 12/1/2026Opened 10/27/2026

State University of New York (SUNY)·New York

77% match

25-01, 391031 - Reconstruct Roof at Facilities Building

Closes 12/8/2026Opened 10/22/2026