Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›Brashier Middle College Bldg 203 HVAC Replacement

Greenville Technical College·South Carolina

Brashier Middle College Bldg 203 HVAC Replacement

Closes 11/26/2025$2.4M – $2.9MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Brashier Middle College Bldg 203 HVAC Replacement project involves the system replacement of HVAC systems, controls, cooling tower, and doaz units. The project is located in Building 203 and will be delivered using the Design-Bid-Build method. The construction cost range is estimated to be between $2,400,000 and $2,900,000. The project coordinator is Michael Ruff, and documents can be obtained from him or [email protected]. • The project involves replacement of HVAC systems, controls, cooling tower, and doaz units. • The project is located in Building 203. • The project will be delivered using the Design-Bid-Build method. • The construction cost range is estimated to be between $2,400,000 and $2,900,000. • The project coordinator is Michael Ruff. • Documents can be obtained from Michael Ruff or [email protected].

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Ruff(Agency Project Coordinator)

[email protected]

(864) 250-8281

Key dates

Opened
10/21/2025
Closes
11/26/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
H59-6358-AT

Budget estimate

$2,400,000 – $2,900,000

Based on the construction cost range of $2,400,000 to $2,900,000, the budget for this project can be estimated to be within this range. The actual budget may vary depending on the bid amount and the contractor's fees. The factors that may influence the likely payment range include the complexity of the project, the materials and labor required, and the contractor's experience and reputation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS OGS Design & Construction - Construction Contractors·New York

Top match · 70%

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Manhattan-Ogden Schools USD 383·Kansas

68% match

USD 383 Theodore Roosevelt and Bluemont HVAC Replacement

Closes 11/4/2026Opened 10/16/2026

University of Massachusetts System·Massachusetts

68% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

Connecticut Town of Brookfield·Connecticut

68% match

Library HVAC Replacement

Closes 11/12/2026Opened 10/8/2026

Memphis-Shelby County Schools·Tennessee

68% match

RFP 110226JKG HVAC Replacements 5 Locations

Closes 11/2/2026Opened 10/2/2026

Maryland Howard County Public Schools·Maryland

68% match

054.27.B3 Harper’s Choice Middle School Chiller & Cooling Tower Replacement

Closes 12/3/2026Opened 10/29/2026

Washington Enterprise Services (DES), Dept. of·Washington

67% match

Wenatchee Valley College- Batjer Chiller Replacement

Closes 11/17/2026Opened 10/23/2026

NYS OGS Design & Construction - Construction Contractors·New York

67% match

47690 ELECTRICAL – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Louisiana's Community and Technical College System·Louisiana

67% match

HVAC Rooftop Units / Chiller Replacement, Northshore Technical Community College, #085 / F.01004592

Closes 11/23/2026Opened 10/22/2026

NYS OGS Design & Construction - Construction Contractors·New York

67% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Northern Virginia Community College·Virginia

67% match

260-B6260-003 MTS Replace Rooftop Unit

Closes 11/2/2026Opened 10/1/2026

University of Missouri-Kansas City·Missouri

67% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

Middlesex Community College·Massachusetts

67% match

Project #MCC 2027-03 HVAC Classroom Renovation Project

Closes 12/2/2026Opened 10/30/2026

Rialto Unified School District·California

67% match

Carter HVAC Replacement

Closes 12/1/2026Opened 10/28/2026

Washington Enterprise Services (DES), Dept. of·Washington

66% match

SSC Auto HVAC Replacement

Closes 11/19/2026Opened 10/20/2026

California Military Department·California

66% match

IFB No. 133848 HVAC Mini-split Heat Pump Replacement Bldg. 6, Joint Forces Training Base

Closes 11/4/2026Opened 10/19/2026

U.S. Department Of Defense·California

66% match

Replace HVAC Rooftop Units at Building 2275

Closes 11/4/2026Opened 10/21/2026

North Carolina Central University·North Carolina

66% match

NC Central University

Closes 11/12/2026Opened 10/13/2026

Lynwood Unified School District·California

66% match

Abbott Elementary School HVAC Unit Replacement

Closes 11/4/2026Opened 10/1/2026

U.S. Department Of Defense·Virginia

66% match

Replace HVAC System and Components at CAD593

Closes 12/2/2026Opened 10/28/2026

Lynwood Unified School District·California

66% match

Abbott Elementary School HVAC Units Replacement Project (Bid No. 03MOT27)

Closes 11/4/2026Opened 10/1/2026

Connecticut Town of Brookfield·Connecticut

66% match

Library HVAC Replacement

Closes 11/12/2026Opened 10/8/2026

Coastal Carolina University·South Carolina

66% match

Purchase HVAC Equipment repair and replacement parts

Closes 12/2/2026Opened 10/28/2026

University of Massachusetts Lowell·Massachusetts

66% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

Horry Georgetown Technical College·South Carolina

66% match

Grand Strand Dental Building Boiler Replacement

Closes 11/16/2026Opened 10/27/2026