The University of Missouri‑Kansas City’s School of Dentistry seeks qualified contractors to replace an existing 188‑ton air‑cooled chiller with a new 178‑ton unit (owner‑furnished) and to replace the primary chilled‑water pump with a new pump and variable‑frequency drive (VFD). The contractor will handle removal, installation, associated piping, electrical, controls, crane and rigging work in an occupied, restricted‑access facility, and provide any necessary control‑system modifications. The project has a $390,000 construction budget, a 3% SDVOB participation goal, and will be awarded after a pre‑qualification process scoring at least 800 points and meeting mandatory safety and performance criteria.
• Remove and install a new 178‑ton air‑cooled chiller (owner‑furnished).
• Replace primary chilled‑water pump and install VFD (owner‑furnished).
• Update related piping, electrical, and control systems; perform crane and rigging operations in a live campus environment.
• Must meet EMR < 1.0 for three years, no work‑related fatalities, and achieve minimum 800/1000 points in the RFQ scoring.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.