Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›26-48 CR 2321 Resurfacing - Phase 1 (SCOP)

Bay County·Florida

26-48 CR 2321 Resurfacing - Phase 1 (SCOP)

Closes 6/30/2026$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bay County Board of County Commissioners is seeking bids from qualified contractors to resurface approximately 2.818 miles of CR 2321 from the Deer Point Lake Bridge to SR 75 (US 231). The project will include earthwork operations, sheet pile installation, adjustments to existing headwalls, installation of guardrail, milling, paving, placement of pavement markings and signage, installation of cross drain pipes, and stabilization of all disturbed areas. • The project is being funded by a Florida Department of Transportation (FDOT) Small County Outreach Program Grant (SCOP) FPN #453084-1-54-01. • A mandatory pre-bid meeting will be held on June 9, 2026, at 10:00 am (CDT) in the Public Works Conference Room. • Bidders must be FDOT pre-qualified in the following major classes of work: Flexible Paving, Hot Plant-Mixed Bituminous Courses, Drainage, and Grading. • Bids will be received until 2:30 pm (CDT) on June 30, 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

(850) 248-8270

Key dates

Opened
5/27/2026
Questions due
6/19/2026
Pre-bid meeting
6/9/2026Mandatory
Closes
6/30/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
26-48

Budget estimate

$1,000,000 – $5,000,000

The budget for this project is not explicitly stated in the document. However, based on the scope of work, which includes resurfacing approximately 2.818 miles of road, installing guardrail, and performing earthwork operations, the estimated budget could be in the range of $1 million to $5 million. This estimate is based on average costs for similar projects, but the actual budget could be higher or lower depending on various factors such as the complexity of the project, the number of bidders, and the availability of materials and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Lowndes County·Georgia

Top match · 69%

TIA-15: Resufacing Phase I

Closes 11/12/2026Opened 10/7/2026

Bay County·Florida

69% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

Mississippi

68% match

Construction of Railroad Rehabilitation Phase 1

Closes 11/2/2026Opened 10/30/2026

Bay County, FL·Florida

68% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

San Bernardino County·California

68% match

Muscoy Area Rehabilitation - Phase 1

Closes 12/3/2026Opened 10/27/2026

Jea·Florida

67% match

1412080446 (RFP) Brandy Branch Generating Station B52-B53 SCR Catalyst Replacement

Closes 12/16/2026Opened 11/22/2025

Georgia Lowndes County Board of Commissioners·Georgia

67% match

TIA-15: Resurfacing Phase I

Closes 11/12/2026Opened 10/7/2026

San Jacinto Community College District·Texas

67% match

CSP #27-04 Building N1 Roof and Envelope Repairs

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of Defense·North Dakota

67% match

48--HIGH STAGE PRECOOLE, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

The City of Columbus·Ohio

66% match

RFQ033889 - Police - Pool Resurfacing

Closes 11/19/2026Opened 10/17/2026

Jefferson County, AL - Department of Roads and Transportation·Alabama

66% match

Contract Resurfacing 2027 – Group 1

Closes 11/17/2026Opened 10/16/2026

U.S. Department Of Defense·Missouri

66% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Beaufort County, SC·South Carolina

66% match

Beaufort County 2027 Resurfacing

Closes 11/17/2026Opened 10/16/2026

Massachusetts Town of Westborough·Massachusetts

66% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Santa Rosa·California

66% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 11/10/2026Opened 9/29/2026

City of Rockford·Illinois

66% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

City of Chino·California

66% match

IB278, PF264, PF270 - MULTIPLE FACILITIES ROOF REPLACEMENT PROJECT

Closes 11/17/2026Opened 10/8/2026

West County Wastewater·California

66% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Hollywood·Florida

66% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

Texas San Jacinto College District·Texas

66% match

CSP #27-04 Building N1 Roof and Envelope Repairs

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/27/2026

Martin County Purchasing·Florida

65% match

CR-708 Bascule Bridge Scour Protection

Closes 11/18/2026Opened 10/9/2026

Town of Honea Path·South Carolina

65% match

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

U.S. Department Of Defense·Missouri

65% match

Resynopsizing solicitation

Closes 11/6/2026Opened 10/22/2026

Clay County·Florida

65% match

County Road 220 Phase 2 – Milling and Resurfacing

Closes 11/30/2026Opened 10/15/2026