This solicitation seeks a qualified general contractor to perform tenant‑fit‑out work on the third‑floor office suite at 900 E. Washington Ave., Colton, CA. The work is limited to interior demolition, new commercial electrical installations, lighting upgrades, interior painting, and installation of a storefront door. The contractor will not be responsible for carpet installation or end‑user move‑in, which are handled by other parties. The project is classified as a small‑project informal bid, subject to California public‑contract code thresholds, with a tight construction window of 30 calendar days from the Notice to Proceed. Bidders must provide a 10 % bid bond, and, if awarded, 100 % performance and payment bonds, along with the required insurance, prevailing‑wage certifications, and a suite of public‑work compliance certifications (non‑collusion, site‑visit, drug‑free workplace, etc.). The District requires a Class B (or A) California contractor license, DIR public‑works registration, and adherence to badge and safety policies on a school campus.
• Tenant‑fit‑out (selective demolition, new partitions, casework, doors)
• Commercial electrical upgrades (new outlets, switches, LED fixtures, panel work)
• Installation of a storefront entry (optional alternate)
• Interior painting, base‑board removal, signage removal, mirror removal
• Coordination of utilities, temporary services, access‑control hardware
• 30‑day construction schedule (target NTP Dec 1 2025, completion Dec 24 2025)
• Mandatory pre‑bid site walk (Nov 14 2025) and required site‑visit certification
• Bid bond 10 % of base bid; 100 % performance & payment bonds required
• Insurance minimums: $1 M/occ – $2 M agg CG, $1 M auto, statutory workers’ comp + $2 M employer liability
• Prevailing‑wage compliance, multiple certifications (drug‑free, tobacco‑free, workplace‑violence, etc.)
• No DSA oversight; District is the AHJ.