The project involves the rehabilitation of the existing sanitary sewer lift station at Carson City Corrections, including removal and replacement of existing pumping equipment, valves, piping, electrical components, and installation of new control systems and telemetry. The contractor will provide all labor, materials, equipment, and coordination required for demolition, installation, testing, startup, and commissioning of the new equipment and controls. The work shall also include excavation, backfill, structure modifications as required, surface restoration, and full site restoration to pre-construction conditions or better.
Some key aspects of the project include:
• Removal and replacement of existing pumping equipment, valves, piping, and electrical components
• Installation of new control systems and telemetry
• Demolition, installation, testing, startup, and commissioning of new equipment and controls
• Excavation, backfill, and structure modifications as required
• Surface restoration and full site restoration to pre-construction conditions or better
• Compliance with prevailing wage rates and labor regulations
• Mandatory pre-bid meeting and site visit
• Submission of bids through the SIGMA VSS website