Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›NE District, Twin Pike Family YMCA, Construction of new 5…

Missouri Department of Transportation·Missouri

NE District, Twin Pike Family YMCA, Construction of new 5 feet wide concrete ADA compliant sidewalk and ramps with handrail

Closes 5/12/2026$30k – $70kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This opportunity calls for the design‑build construction of a new 5‑ft‑wide concrete sidewalk, ADA‑compliant ramps, and handrails totaling approximately 2,150 ft of linear pavement on the Twin Pike Family YMCA property in Louisiana, MO. The work includes site preparation, concrete placement, finishing, ramp construction with handrails, and any other items noted on the plans. Bidders must purchase the digital plans from Great River Engineering, be on the Missouri DOT Qualified Contractor List, comply with prevailing‑wage requirements, provide a 5 % bid bond or cashier’s check, and complete OSHA 10‑hour safety training within 60 days of starting work. The contract will be awarded to the lowest responsive and responsible bidder. • Approx. 2,150 ft of 5‑ft‑wide concrete sidewalk with ADA‑compliant ramps and handrails. • Mandatory purchase of plans ($45) and inclusion on Great River Engineering’s plan‑holder list. • Prevailing‑wage (MO Wage Order 32 or Davis‑Bacon) and MoDOT Qualified Contractor List compliance required. • 5 % bid bond or cashier’s check, sealed‑paper bids only, deadline 12 May 2026, 10:30 a.m.

Attached files

Contact

(417) 886-7171

Key dates

Opened
4/13/2026
Closes
5/12/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
TAP 9901 (307)

Budget estimate

$30,000 – $70,000

The sidewalk is 2,150 ft long, 5 ft wide, and likely 6 in (0.5 ft) thick, yielding roughly 200 yd³ of concrete. At an estimated $150/yd³ for material plus labor, handrails, and related site work, total project costs are roughly $30,000‑$70,000. This range accounts for variability in local labor rates, finish requirements, and any unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Missouri Department of Transportation·Missouri

Top match · 75%

NW District, City of Milan, Construction of a 6' wide ADA compliant sidewalk along Business Highway 5 with curb and gutter to accommodate pedestrian traffic from Richard's Supermarket to Casey's General Store.

Closes 11/13/2026Opened 10/20/2026

Missouri Department of Transportation·Missouri

73% match

NW District, City of Bethany, Constructing South Harrison R2 pool sidewalk project

Closes 11/19/2026Opened 10/19/2026

Missouri Department of Transportation·Missouri

73% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Missouri Department of Transportation·Missouri

72% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Ormond Beach - Purchasing Office·Florida

72% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

City of Fort Wayne·Indiana

72% match

0963C - Five Points Neighborhood Concrete Repairs

Closes 11/12/2026Opened 10/29/2026

Maryland Baltimore City Department of Transportation·Maryland

72% match

TR26011-ADA Sidewalk Construction Citywide Urgent Need (JOC)

Closes 11/18/2026Opened 10/23/2026

City of North Augusta·South Carolina

72% match

US 25 (Georgia Avenue) Traffic Calming

Closes 11/12/2026Opened 10/26/2026

NYS East Fishkill, Town of·New York

71% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Maryland Baltimore City Department of Transportation·Maryland

71% match

TR-27003 RECONSTRUCTION OF FOOTWAYS CITY WIDE

Closes 11/18/2026Opened 10/24/2026

City of Charlotte·North Carolina

71% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Missouri Department of Transportation·Missouri

71% match

Central District, Dent County, Construction of New Sidewalk

Closes 11/12/2026Opened 9/17/2026

San Bernardino County·California

71% match

North San Bernardino ADA Ramps

Closes 11/19/2026Opened 10/21/2026

San Bernardino County·California

71% match

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026

Missouri Department of Transportation·Missouri

71% match

Central District, City of Linn Creek, sidewalk improvements to West Valley Drive

Closes 11/5/2026Opened 9/30/2026

City of Fayetteville·North Carolina

70% match

ITB-Breezewood Avenue Sidewalk Improvements

Closes 11/12/2026Opened 10/5/2026

Maryland Baltimore City Department of Transportation·Maryland

70% match

TR27002 Reconstruction of Footways Citywide

Closes 11/18/2026Opened 10/24/2026

NYS Rochester, City of·New York

70% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

Missouri Department of Transportation·Missouri

70% match

Central District, New Bloomfield, construction of ADA compliant sidewalk along Willow Drive and installation of RRFB at Route J school crossing

Closes 11/5/2026Opened 10/7/2026

Maryland Carroll County Government - Procurement·Maryland

70% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

Maryland State Highway Administration·Maryland

70% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

Maryland Baltimore City Department of Transportation·Maryland

70% match

TR27001 -Reconstruction of Footways Citywide

Closes 11/17/2026Opened 10/23/2026

City of Richmond Government·Virginia

70% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Richland County·South Carolina

70% match

Friarsgate Boulevard Sidewalk Project

Closes 8/28/2027Opened 7/28/2026

City of Riverside·California

70% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026