Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›ENG Point Reyes-Petaluma at Nicasio Valley Road Turn Pocket

County of Marin·California

ENG Point Reyes-Petaluma at Nicasio Valley Road Turn Pocket

Closes 7/20/2026$1.2M – $1.6MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This public‑works project upgrades a turn pocket on Point Reyes‑Petaluma Road in Nicasio, Marin County, involving pavement rehabilitation, road widening, a soldier‑pile retaining wall, drainage improvements, and related signage and striping. The work must be completed by the lowest responsible bidder meeting California prevailing‑wage, licensing, and debarment requirements, with a 10 % bid bond and a 5 % retention. • Cold planing of existing pavement, recompaction, and hot‑mix asphalt overlay (2‑6 in. thickness). • Construction of a 3 ft tall soldier‑pile concrete lagging retaining wall, including drainage, shoring, and backfill. • Installation of new storm‑drain pipe (15 in. RCP and 24 in. HPP), sub‑drain system, and minor drainage enhancements. • Road widening, concrete curb and median, signage, pavement markings, and traffic‑control systems. • Full compliance with California Labor Code Part 7, Public Contract Code, prevailing‑wage rules, and subcontractor debarment certifications.

Attached files

Contact

Rachel Calvert(Project Contact)

[email protected]

Key dates

Opened
7/2/2026
Questions due
7/13/2026
Closes
7/20/2026
Duration
50 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
Solicitation No. 48005

Budget estimate

$1,200,000 – $1,600,000

The engineer’s estimate for the entire scope is $1,400,000. Assuming a typical contractor margin of 5‑15 % for a public‑works project of this size, the net earnings for the prime contractor would likely fall between $1.2 M and $1.6 M. Factors influencing the range include the final bid price submitted, the cost of required bonds and insurance, any change orders, and the retention (5 % held until final acceptance).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of San Luis Obispo·California

Top match · 59%

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

County of Los Angeles Department of Public Works·California

57% match

TDS0001709 - San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

U.S. Department Of Transportation·Hawaii

57% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

City of Shawnee·Kansas

57% match

Resolution No. 2056

Closes 4/22/2030Opened 4/22/2025

City of Monterey·California

57% match

VETERANS PARK BIKE PATH, SEGMENT 4 PROJECT (NCP2435)

Closes 12/8/2026Opened 10/26/2026

County of San Luis Obispo·California

56% match

Nacimiento Water Project Unit G Repair Construction Management

Closes 11/3/2026Opened 9/29/2026

City of Santa Cruz·California

56% match

HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

Closes 11/5/2026Opened 10/21/2026

County of Monterey·California

56% match

Prunedale Roundabout, Project No. 1176

Closes 11/18/2026Opened 9/18/2026

City of Morgan Hill·California

55% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

County of Sacramento·California

55% match

Medi-Cal Navigation Services

Closes 11/3/2026Opened 10/13/2026

City of Morgan Hill·California

55% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/23/2026

City of El Paso De Robles·California

55% match

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

Closes 11/18/2026Opened 10/29/2026

California Grants·California

55% match

Proposition 68 Technical Assistance

Rolling / TBD closeOpened 9/5/2024

City of Rancho Cordova·California

55% match

Rancho Cordova Complete Streets Implementation Guide

Closes 11/13/2026Opened 10/9/2026

Napa Valley Transportation Authority·California

55% match

South Napa County Station Area Plan

Closes 11/6/2026Opened 10/6/2026

City of Shawnee·Kansas

55% match

Ordinance No. 3518

Closes 3/4/2031Opened 3/4/2025

Parkland Health & Hospital System·Texas

54% match

RFP#1993189- MATOC_Wayfinding & Signage

Rolling / TBD closeOpened 1/1/2017

County of Santa Cruz·California

54% match

Eureka Canyon Road PM 8.11 and 8.39 Storm Damage Repair Projects

Closes 11/5/2026Opened 10/8/2026

California Grants·California

54% match

Coachella Valley Proposition 68 Parks, Conservation Land Access and Climate Change Response Grant Program

Rolling / TBD closeOpened 1/21/2025

Bill and Hillary Clinton National Airport·Arkansas

54% match

Parking Guidance System

Rolling / TBD closeOpened 4/14/2026

New Mexico Department of Transportation·New Mexico

54% match

Phase IA/B Study Access Management Plan for BL‑13 from I‑25 to NM 314

Closes 11/3/2026Opened 10/2/2026

City of San Ramon·California

54% match

Alcosta Senior & Community Center Outdoor Handrail Replacement (CIP #955584)

Closes 12/3/2026Opened 10/29/2026

U.S. Department Of Agriculture·District of Columbia

54% match

New Mexico Forest Engineering and Road Maintenance (FERM)

Closes 1/31/2028Opened 2/13/2023

California Department of Transportation·California

54% match

RHMA, cold plane AC pavement, vegetation control (minor Conc) and MGS.

Closes 12/1/2026Opened 10/5/2026

City of Carlsbad·California

54% match

Paseo Del Norte Guardrail

Closes 11/10/2026Opened 10/9/2026