The Ohio Department of Rehabilitation and Correction is seeking a qualified contractor to modify and upgrade the PCI telecom backbone at the Pickaway Correctional Institute. The scope includes installation of new fiber‑optic and copper (CAT‑6) cabling, conduit routing (minimum 24‑in. burial), new 48‑port Leviton patch panels, rack and cabinet installation, UPS and switch integration, HVAC split‑system installation, and security camera upgrades. The contract is a fixed‑price bid valued at approximately $1.8 million with a 365‑day completion schedule.
• Install directional‑bore conduit and hand‑holes to connect multiple buildings (Powerhouse, A‑Dorm, B‑Dorm, Library, Meat Plant, Paint Shop, Water‑Treatment, Sally Shack).
• Provide telecom equipment: 48‑port Leviton patch panels, Leviton modular RJ‑45 jacks, Great Lakes 4‑post racks, Corning fiber termination enclosures, and UPS/switches supplied by ODRC.
• Perform related low‑voltage work: HVAC ductless split systems, CCTV camera installation, and power distribution (208 V feed, 30 A NEMA‑3R disconnect).
• Comply with state requirements: EDGE‑program 5 % participation, domestic‑steel compliance, prevailing‑wage rules, SUPR certification, and executive‑order restrictions on offshore services.