Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Engineering Services
  5. ›Main Station Standpipe Recoating Design and Construction Ins

City of Cincinnati·Ohio

Main Station Standpipe Recoating Design and Construction Ins

Closes 3/10/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Cincinnati’s Greater Cincinnati Water Works seeks a professional engineering firm to act as Engineer of Record for the historic Main Station standpipe (circa 1902). The scope covers four phases: detailed design and method selection, bid‑document preparation, construction administration (including permit support, on‑site meetings, submittal reviews, and NACE‑certified inspection), and a one‑year warranty support period. The contract is for three years with an optional one‑year renewal, and the vendor must meet MBE/WBE subcontracting goals and stringent information‑security requirements for critical infrastructure data. • Phase 1 – Complete design package (drawings, specifications, cost opinion). • Phase 2 – Support bidding, answer technical queries, incorporate addenda. • Phase 3 – Construction administration, permit assistance, on‑site inspections, NACE‑certified paint inspection, welding inspection. • Phase 4 – Deliver as‑built records and provide one‑year warranty support. Key obligations include adherence to water‑quality constraints, mandatory pre‑bid attendance, and compliance with Ohio public‑records and insurance/bonding requirements.

Attached files

Contact

Alexa Kafury(Primary Contact)

alexa.kafury@cincinnati-oh.gov

(513) 352-3284

Key dates

Opened
1/21/2026
Questions due
2/12/2026
Pre-bid meeting
2/10/2026Mandatory
Closes
3/10/2026
Projected award
3/31/2026
Duration
3 years

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP265X901134

Budget estimate

$500,000 – $2,000,000

No budget is disclosed, but comparable municipal engineering contracts for historic infrastructure recoating typically range from $0.5 million to $2 million depending on design complexity, inspection requirements, and warranty obligations. Assuming a mid‑size engineering firm with the necessary certifications, the likely fee could fall within this band. Factors influencing the range include the extent of site‑specific investigations, the level of NACE‑certified inspection needed, and the cost of managing subcontractors to meet MBE/WBE goals.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Tampa, Florida·Florida

Top match · 66%

RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design

Closes 12/3/2026Opened 10/30/2026

City of Frazee, MN·Minnesota

64% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

Georgia Ellijay-Gilmer County Water & Sewerage Authority·Georgia

63% match

South Main Street Lift Station

Closes 11/12/2026Opened 10/5/2026

City of Park Ridge·Illinois

63% match

FIRE STATION 36 ENGINEERING DESIGN SERVICES

Closes 11/5/2026Opened 9/30/2026

Massachusetts City of Haverhill·Massachusetts

63% match

South Mill Street Pump Station Header Piping Replacement

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Health And Human Services·South Dakota

63% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

City of Charlotte·North Carolina

62% match

Belmont Force Main in Mecklenburg

Rolling / TBD closeOpened 6/1/2027

Hendry County Board of County Commissioners·Florida

62% match

Architectural and Engineering Services for the Design of the Hendry County Public Safety Station

Closes 11/20/2026Opened 10/28/2026

City of Opa-locka·Florida

62% match

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026

City of Winston Salem·North Carolina

62% match

Pipe Storage Building Design for Utilities

Closes 11/10/2026Opened 10/16/2026

Connecticut Town of South Windsor·Connecticut

62% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026

Gwinnett County Government·Georgia

61% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of Wilton Manors·Florida

61% match

Lift Station No. 1 Replacement

Closes 11/2/2026Opened 9/30/2026

City of Charlotte·North Carolina

61% match

Ashe Plantation Lift Station 2

Rolling / TBD closeOpened 5/1/2027

Austin Energy·Texas

61% match

Distribution Getaway Duct Bank Bore at East Village subst

Rolling / TBD closeOpened 7/21/2025

Georgia City of Valdosta·Georgia

61% match

Stallings Lift Station & Force Main Improvements

Closes 11/5/2026Opened 8/11/2026

City of Phoenix·Arizona

61% match

LIFT STATION 47 - REDUNDANT FORCE MAIN DESIGN-BID-BUILD

Closes 11/10/2026Opened 10/15/2026

Metropolitan Council·Minnesota

61% match

Notice of Intent to Solicit Blue Line Franklin Station Renovation

Closes 11/20/2026Opened 10/14/2026

City of Thornton·Colorado

61% match

New Union Ditch Concrete Channel Conversion and Headgate

Closes 11/5/2026Opened 10/1/2026

City of Hilliard, Ohio·Ohio

61% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

City of St. Michael·Minnesota

61% match

39th Street Lift Station & Forcemain Decommission Project

Closes 11/3/2026Opened 10/16/2026

City of Ontario·California

61% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Town of Groton·Connecticut

61% match

NBC LINCOLN SEPTAGE FACILITY IMPRV., CONTRACT 710.00C

Closes 11/12/2026Opened 10/31/2026