North Dakota State University is soliciting bids to supply and install a comprehensive furniture package for the new Richard Offerdahl ’65 Engineering Complex (Building 167) at its Fargo campus. The contract requires delivery, installation, and warranty support for a wide variety of institutional‑grade seating, tables, desks, storage units, and specialty items, all meeting detailed specifications for materials, finishes, load ratings, and integrated power/USB provisions. The scope includes several phased installation windows in summer 2026 and a later phase in summer 2027, with the winning vendor responsible for coordinating delivery logistics, complying with freight‑elevator constraints, and providing after‑sales service.
• Supply and install ~444 pieces of furniture (chairs, stools, desks, tables, storage, specialty pods) per the detailed specification and quantity schedule.
• Meet design requirements such as 300 lb load rating, specific laminate/paint finishes, integrated power modules, and non‑substitutable items (e.g., Herman Miller models).
• Follow installation schedule: primary installation July 20 2026 (first & second floors), additional early‑phase installs June 29 2026, and final Area F installs Summer 2027.
• Provide full warranty, tax‑exempt pricing (NDSU is tax‑exempt), and all costs inclusive of freight, handling, and installation.