The Federal Bureau of Prisons (FBOP) is seeking a contractor to provide all labor, materials, and equipment necessary for tapping into the existing 12" Ductile Iron Water Main, reducing it to 6" pipe, to supply water to the new water softener system at the Federal Correctional Institution (FCI) Jesup, GA. The work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing a 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6-inch supply and a return on the 12-inch water main underground, penetrating through the metal building wall, and installing a 6-inch line to the existing water softener system. The contractor must comply with all local, state, and federal regulations.
• The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) and past performance.
• The contractor must provide all materials, labor, and equipment to complete the project.
• The contractor must comply with all applicable federal, state, and local taxes.
• The contractor must provide a firm fixed price for the completion of the project.
• The project must be completed within 112 calendar days after receiving the notice to proceed.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.