Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Construction
  5. ›Belle Avenue Mill & Overlay Project| Locust Street to Elm…

City of Davenport·Iowa

Belle Avenue Mill & Overlay Project| Locust Street to Elm Street

Closes 3/11/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Davenport is seeking bids for the Belle Avenue Mill and Overlay Project, which includes resurfacing Belle Avenue from Locust Street to Elm Street. The project involves milling, asphalt overlay, ADA sidewalk and ramps, resetting of existing utility surface features, replacement of adjacent driveway approaches, signage, topsoil, sodding, and erosion control. The contract time is approximately 75 days, with a completion date of August 15, 2026. • The project requires the contractor to provide all labor, materials, and equipment necessary for the resurfacing of the existing roadway. • The contractor must comply with the City of Davenport's Supplemental Specifications to the SUDAS Specifications. • The contractor is responsible for coordinating with utility companies and ensuring that all utilities remain in service during construction. • The contractor must provide a 72-hour notice to the Engineer prior to the removal of any street name signs or traffic control signs. • The contractor is responsible for making measurements and laying out the permanent installation of signs. • The contractor must provide and maintain protection devices to prevent concrete slurry, silt, or other debris from entering the storm sewer system. • The contractor is responsible for washing vehicles at appropriate areas within the site to prevent tracking of material outside the project limits.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Mary Sakalosky(Purchasing Division)

[email protected]

(563) 326-7772

Key dates

Opened
2/24/2026
Questions due
3/3/2026
Closes
3/11/2026
Duration
75 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
25-50

Budget estimate

$500,000 – $1,500,000

The budget for this project is estimated to be between $500,000 and $1,500,000, based on the scope of work and the materials required. The project involves resurfacing approximately 1 mile of road, which can cost between $200,000 and $500,000 per mile, depending on the materials and labor required. Additionally, the project requires the replacement of signs, ADA sidewalk and ramps, and other features, which can add to the overall cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Huron·South Dakota

Top match · 69%

2026-03 Milling and Overlay BT

Closes 12/31/2026Opened 2/18/2026

City of Johnson·Arkansas

69% match

City Street Overlay and Striping Improvements

Closes 11/5/2026Opened 10/18/2026

Burlington Township·New Jersey

68% match

Addendum #1 - "Milling & Overlay of Various Streets", Contract No. 2024-07

Rolling / TBD closeOpened 4/20/2026

City of Hastings·Nebraska

68% match

E Street Resurfacing - Burlington Ave to Pine Ave CH 2026-57

Rolling / TBD closeOpened 9/18/2026

City of Slidell·Louisiana

67% match

27-B009 Taxilane Mill and Overlay

Closes 11/10/2026Opened 10/7/2026

City of Charlotte·North Carolina

67% match

Sharon Road at Eastburn Road Improvements

Rolling / TBD closeOpened 1/2/2026

Massachusetts City of Brockton·Massachusetts

67% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

MTA - NYC Transit (NYCT)·New York

67% match

ESS Jay Street-MetroTech and 207th Street Yard CCTV Wrap Up

Closes 11/19/2026Opened 10/13/2026

City of Thornton·Colorado

66% match

Quebec Street Widening - North of 136th Avenue

Closes 11/20/2026Opened 10/1/2026

Tacoma·Washington

66% match

E Portland Ave (64-72) Overlay

Closes 11/3/2026Opened 9/29/2026

City of Charlotte·North Carolina

66% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Los Angeles County Public Works·California

66% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

New Orleans Regional Transit Authority·Louisiana

66% match

Tree Cutting Streetcar Line & Vegetation Clearance

Closes 11/17/2026Opened 10/15/2026

Missouri Department of Transportation·Missouri

66% match

SE District, City of Poplar Bluff, PB Pine Street Crossing project

Closes 11/3/2026Opened 10/6/2026

City of Charlotte·North Carolina

66% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Fort Wayne·Indiana

65% match

0890C - Eckart St Reconstruction: S Anthony Blvd to Winter St

Closes 11/12/2026Opened 10/29/2026

Port of Lake Charles·Louisiana

65% match

Industrial Park East Rail Extension & Trans‑Loading Yard

Closes 11/19/2026Opened 10/13/2026

Louisiana Jefferson Parish·Louisiana

65% match

WEST ESPLANADE AVENUE U-TURN NEAR EDENBORN AVENUE - JEFFERSON

Closes 12/15/2026Opened 10/21/2026

City of Cincinnati·Ohio

65% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Ontario·California

65% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Charlotte·North Carolina

65% match

Robinson Church Road Sidewalk, Brawley Lane to Jones Creek Lane

Rolling / TBD closeOpened 3/11/2026

City of Charlotte·North Carolina

65% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

65% match

Bryant Farms Phase 2 (Progressive Design-Build)

Rolling / TBD closeOpened 1/1/2026

Louisiana Regional Transit Authority·Louisiana

65% match

Tree Cutting Streetcar Line & Vegetation Clearance

Closes 11/17/2026Opened 10/26/2026

City of Sylvania, OH·Ohio

65% match

Monroe Street Lighting Improvements (Harroun Road to Acres Road)

Closes 11/3/2026Opened 10/12/2026