This contract involves the installation of a high‑solids, double‑broadcast epoxy (resinous) flooring system and a 6‑inch heavy‑gauge sanitary wall base at the McHenry County Veterinary and Public Health Building in Crystal Lake, Illinois. The work must be completed by mid‑December 2026 and includes moisture testing, substrate preparation, application of primer and two broadcast layers, and the installation of a compliant wall base. The County requires a 10 % bid bond, performance and payment bonds, and full insurance coverage, and all materials must meet specified chemical‑resistance and slip‑resistance standards. The award was made to CCI Flooring following a competitive sealed‑bid process.
• Scope: 1/8‑in double‑broadcast epoxy flooring, 4‑6‑in sanitary wall base, moisture testing, substrate prep, and curing.
• Schedule: solicitation posted Aug 31 2026, bid submission Sep 22 2026, award Oct 20 2026, work completed by Dec 14 2026.
• Requirements: 10 % bid bond, 110 % performance/payment bonds, insurance, SAM.gov registration, factory‑certified applicator status, warranty, and adherence to County’s green‑product and safety policies.