Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Engineering Services
  5. ›Engineering Design and Specifications for CJH Relief…

Confederated Tribes of the Colville Reservation·Washington

Engineering Design and Specifications for CJH Relief Tunnel Water Source

Closes 3/28/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Confederated Tribes of the Colville Reservation are seeking a qualified engineering firm to develop detailed design packages, specifications, and cost estimates for tapping the existing Chief Joseph Dam Relief Tunnel (Third Water Source) and delivering water to the Chief Joseph Hatchery’s head‑box and adult broodstock holding raceways. The work must incorporate as‑built documentation, update geotechnical data if needed, perform hydraulic and temperature modeling, and optionally assess direct delivery to six adult holding ponds. Deliverables include staged design drawings (30 %, 60 %, 90 % and final), a permit‑ready package, and a comprehensive cost estimate with a 20 % contingency. All design work must be sealed by a Washington‑state‑licensed PE and the contractor must meet tribal procurement requirements (Indian Preference, TERO certification, insurance, retainage/bond). • Produce multi‑disciplinary construction‑ready designs (civil, structural, mechanical, electrical, etc.) for the water‑source tap and transmission pipeline. • Review and, if necessary, update the 2009 geotechnical report and conduct flow‑temperature modeling for the new water delivery system. • Provide a detailed engineer’s cost estimate, schedule five design‑phase meetings, and deliver final documents suitable for permitting.

Attached files

Contact

Matthew McDaniel(Chief Joseph Hatchery Manager)

matthew.mcdaniel.fnw@colvilletribes.com

Key dates

Opened
2/2/2026
Questions due
2/18/2026
Closes
3/28/2026
Duration
4 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP-Engineering-Design-Specifications-for-CJH-Relief-Tunnel-Water-Source_001.pdf

Budget estimate

$200,000 – $500,000

Based on a four‑month design effort involving multiple engineering disciplines, a Washington‑licensed PE, and the production of full construction‑ready documentation, a typical hourly‑rate‑based cost for a firm of this size would fall roughly between $200,000 and $500,000. The lower end assumes a lean team with modest travel; the higher end assumes a larger staff, extensive modeling, and the optional adult‑pond delivery design.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Kentucky

Top match · 67%

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

67% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Columbus Ohio·Ohio

67% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

Western Virginia Water Authority·Virginia

67% match

ITB - SPRING HOLLOW WTF CLEARWELL

Closes 11/17/2026Opened 10/15/2026

Eastern Municipal Water District·California

67% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

Barnegat Township·New Jersey

67% match

ENGINEERING POOL

Rolling / TBD closeOpened 6/26/2026

City of Rogers·Arkansas

66% match

2026 CPRG NCD SOQ

Closes 11/10/2026Opened 10/25/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

66% match

TDCJ - Water Treatment Plant for Memorial

Closes 11/23/2026Opened 10/7/2026

NYS Dutchess County Water and Wastewater Authority·New York

66% match

Quaker Hill Water-Hyde Park Interconnection-Storage Tank-Design Services

Closes 11/25/2026Opened 10/20/2026

Medina County, OH Sanitary Engineering·Ohio

66% match

Chatham Water Tower Rehabilitation 2027

Closes 11/6/2026Opened 10/16/2026

City of Dunedin·Florida

66% match

Water Production Well Facilities Project

Closes 11/18/2026Opened 10/12/2026

Oregon Urban Flood Safety & Water District·Oregon

66% match

Water Resources Engineering On-Call Services

Closes 12/3/2026Opened 10/19/2026

U.S. Department Of Defense·Hawaii

66% match

Elevated Water Storage Tanks, Kolekole and East Range, Schofield Barracks, Oahu, Hawaii

Closes 9/8/2027Opened 9/8/2026

County of Ontario·New York

66% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

Kansas Department of Wildlife and Parks·Kansas

66% match

Pratt Water System Improvements

Closes 11/10/2026Opened 10/12/2026

NYS Dutchess County Water and Wastewater Authority·New York

66% match

Quaker Hill-Hyde Park Interconnect-Water Main & Pump Station

Closes 11/25/2026Opened 10/20/2026

Rural Community Water District of Georgetown County·South Carolina

66% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

Covington Municipality·Rhode Island

66% match

088-26-GREEN INFRASTUCTURE STORMWATER PROJECT DESIGN

Closes 11/2/2026Opened 11/2/2026

City of Farmers Branch·Texas

66% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

Oregon City of Ashland·Oregon

65% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Virginia Beach·Virginia

65% match

COVB-26-101639-2 - Central Resort District Drainage Improvement Phase 1 Design-Build

Closes 11/5/2026Opened 10/23/2026