The Upland High School CTE HVAC Project involves the construction of a new single‑story HVAC technology classroom addition and the renovation of existing vocational spaces on the Upland High School campus. The scope includes demolition, masonry, structural‑steel framing, metal roofing, concrete work, site improvements, and full mechanical, electrical, plumbing, and fire‑alarm systems to support the HVAC instructional program. The contractor will be responsible for coordinating with the school district, meeting strict California DSA, Title 24, and NPDES requirements, and completing the work while the school remains occupied.
• New 1‑story masonry and steel building for the HVAC CTE shop (≈15,000 SF).
• Complete MEP installation: HVAC equipment (furnaces, package units, mini‑splits), electrical power & lighting, plumbing fixtures, fire‑alarm and sprinkler systems.
• Site work: grading, utility relocation, concrete flatwork, parking re‑striping, chain‑link fence, storm‑water pollution control plan.
• Demolition of existing finishes, interior partitions, and related finish work.
• Compliance with DSA, California Building Code, OSHA, and NPDES storm‑water regulations; mandatory testing, inspections, and close‑out documentation.