Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Construction
  5. ›Sierra Wash Erosion Mitigation Project at Glover Road

Town of Oro Valley·Arizona

Sierra Wash Erosion Mitigation Project at Glover Road

Closes 10/1/2026$500k – $1.5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Oro Valley is soliciting sealed bids to design, construct, and install a drainage‑infrastructure erosion‑mitigation system along Sierra Wash at Glover Road. The scope includes building a concrete chute spillway at the outlet of an existing three‑barrel reinforced concrete box culvert, installing a gabion mattress apron, and providing rock‑faced concrete slope protection. The work is funded in part by FEMA’s Hazard Mitigation Grant Program and must be completed within 75 calendar days of the Notice to Proceed. Bidders must be licensed contractors in Arizona and provide performance and payment bonds, insurance, and a business license. The project includes site preparation, concrete work, gabion structures, hydroseeding, and traffic‑control measures. Liquidated damages of $640 per day apply for late completion. <br/>• Concrete chute spillway and cutoff wall construction<br/>• Gabion apron and cutoff wall installation<br/>• Rock‑faced concrete slope protection<br/>• Clearing, grubbing, and site excavation<br/>• Traffic management and hydroseeding<br/>• Must comply with FEMA grant requirements and Arizona licensing

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kelsey Wuoti(Bid Contact)

[email protected]

(520) 229-4726

Key dates

Opened
9/3/2026
Pre-bid meeting
9/17/2026
Closes
10/1/2026
Duration
75 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
IFB27019

Budget estimate

$500,000 – $1,500,000

The solicitation does not disclose the contract value. Based on typical costs for similar drainage‑infrastructure projects in Arizona—covering concrete chute construction, gabion walls, slope protection, site preparation, traffic control, and associated engineering—an estimate ranges from roughly $500,000 for a minimal design to $1.5 million for a fully engineered, fully funded implementation with premium materials and rapid‑completion requirements. Factors influencing the final amount include material prices, labor rates, the extent of site access work, and any additional FEMA‑mandated mitigation measures.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Grants·California

Top match · 70%

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

70% match

AMR, Cambria & Westmoreland Cnties

Closes 11/12/2026Opened 10/16/2026

Nevada Government·Nevada

69% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of The Interior·Colorado

69% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

68% match

AMR, Beulah Rd Wilkins Twp. (Lucia Dr), Allegheny

Closes 11/12/2026Opened 10/16/2026

Maryland Baltimore County Government·Maryland

68% match

26030 GX0 Old Frederick Road Slope Stabilization

Closes 11/5/2026Opened 8/29/2026

California Department of Transportation·California

68% match

Construct DPP infiltration areas, capture housing, bioswales, & MVPs.

Closes 11/10/2026Opened 9/28/2026

California Grants·California

68% match

Coachella Valley Mountains Conservancy Proposition 4 Nature Based Solutions and Climate Adaptation Grant Program

Rolling / TBD closeOpened 3/13/2026

U.S. Department Of Transportation·Washington

67% match

CA NP KICA PMS(1), Pavement Preservation Kica Cedar Grove

Closes 8/13/2027Opened 8/13/2026

California Department of Transportation·California

67% match

Construct GSRD, DPPIA and install irrigation system.

Closes 12/8/2026Opened 10/19/2026

Town of Glover·Vermont

67% match

Glover Guardrail Repairs

Closes 11/24/2026Opened 10/20/2026

El Dorado Irrigation District·California

67% match

Sly Park Intertie Improvements - Habitat Mitigation and Monitoring Plan Implementation

Closes 11/12/2026Opened 10/16/2026

California Grants·California

67% match

Prop 4 – Wildfire and Forest Resilience

Rolling / TBD closeOpened 6/8/2026

U.S. Department Of Transportation·Washington

67% match

WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing

Closes 7/22/2028Opened 7/22/2026

County of Santa Cruz·California

67% match

HIGHLAND WAY PM 5.60 AND 5.80 STORM DAMAGE REPAIR PROJECTS, FEDERAL PROJECT No. ER-15J2 (005 & 006)

Closes 11/5/2026Opened 10/8/2026

City of Redding·California

67% match

STILLWATER BUSINESS PARK PROJECT – PHASE 2A - TREE REMOVAL

Closes 11/5/2026Opened 10/20/2026

California Grants·California

67% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

U.S. Department Of Transportation·Washington

67% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 8/12/2026

California Grants·California

67% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

Clark County·Nevada

67% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

California Grants·California

67% match

Baldwin Hills & Urban Watersheds Conservancy (BH UWC) Proposition 4: Community and Climate Resilience Grant Program

Rolling / TBD closeOpened 5/6/2026

City of Fitchburg·Wisconsin

67% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

Nevada Government·Nevada

67% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Maryland Department of Transportation·Maryland

67% match

MD 249 (Piney Point Road) from Thomas Road to Stark Drive -Drainage Improvements -Design-Build

Closes 11/17/2026Opened 9/29/2026

DeSoto Parish Police Jury·Louisiana

67% match

2026 DPPJ Road and Drainage Improvements Cotton Belt

Closes 11/10/2026Opened 10/15/2026