The Department of State Hospitals is seeking qualified contractors to provide a complete supplemental HVAC system for the Central Kitchen of its Metropolitan facility in Norwalk, CA. The work includes the supply and installation of two outdoor air‑conditioning units, eight indoor wall‑mounted mini‑split units, associated refrigerant and condensate piping, and the electrical infrastructure needed to power the new equipment. The contract is a lump‑sum, 180‑day construction effort with mandatory pre‑bid site inspection, stringent infection‑control and safety requirements, and extensive documentation and reporting obligations. Small‑business and Disabled Veteran Business Enterprise (DVBE) participation are required, with associated preferences and incentives. Bonds equal to 100 % of the contract price and liquidated‑damage provisions of $3,000 per day apply.
• Install 2 new outdoor HVAC units with foundations, supports, and piping.
• Install 8 wall‑mounted mini‑split indoor units and complete refrigerant loop.
• Provide all electrical work, including conduit, panels, and wiring, to power the system.
• Comply with hospital infection‑control (ICRA) containment, prevailing‑wage, DVBE, and small‑business requirements; submit extensive submittals, testing, commissioning, and close‑out documents.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.