The City of Apache Junction is seeking proposals for the design and construction of approximately 8.5 miles of fiber optic infrastructure. The project requires the installation of conduit and fiber for the City's use. The successful bidder will be required to provide labor, materials, transportation, storage, equipment, and other services as needed. The project is advertised in the Arizona Republic, and additional information can be obtained from Anna Davis. A mandatory pre-bid meeting will be conducted on 9/16/2025. The City reserves the right to reject any and all bids and to waive informalities and technicalities. Key aspects of the project include:
• Installation of approximately 8.5 miles of fiber optic infrastructure
• Design and construction of the fiber optic infrastructure
• Provision of labor, materials, transportation, storage, equipment, and other services as needed
• Compliance with City requirements and specifications
• Attendance at a mandatory pre-bid meeting on 9/16/2025
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.