The City of Marysville is seeking bids for a traffic‑calming streetscape improvement along East 5th Street (from Walnut to Poplar Streets). The scope includes removal of existing pavement, curbs, gutters, and underground utilities, installation of new curbs, ramps, sidewalks, detectable warning surfaces, street lighting, drainage upgrades, and landscaping, plus related site work such as grading, embankment, and erosion control. The project will be performed under prevailing‑wage (Davis‑Bacon) and environmental compliance requirements, with a total engineered estimate of roughly $2.43 million.
• Clear and Grub the existing pavement, remove curbs, gutters, pipes, and catch basins.
• Install new curbs (type 6 and type 2‑B), curb ramps, sidewalks, brick pavers, and detectable‑warning tiles.
• Provide new storm‑water drainage, street lighting, erosion control, and seed/mulch for landscaping.