This solicitation calls for the full reconstruction of two residential streets in Munson Township—Nicoles Way and Sutton Place—including removal of existing pavement, subgrade stabilization with cement, and placement of new asphalt concrete layers. The work encompasses clearing and grubbing, extensive excavation, cement‑stabilized subgrade preparation, installation of drainage under‑drains, and final surface treatments such as tack coat and striping. The contractor must furnish all labor, materials, equipment, and supervision required to complete the project within a 42‑day window.
• Scope: demolition of existing pavement (≈1,080 SY), subgrade stabilization (≈17,750 SY), asphalt base and surface courses (≈3,540 CY), drainage pipe installation (860 FT), and associated site work (topsoil, seeding, traffic control).
• Key Materials: Portland cement (≈635 TON), asphalt concrete (≈2,540 CY), tack coat (≈1,725 GAL), and various aggregate bases.
• Schedule: earliest start 07/06/2026, latest completion 09/28/2026; contractor must meet a 42‑day construction period.