The Calcasieu Parish Consolidated Gravity Drainage District 1 is seeking bids for the Maplewood Phase‑2 drainage improvement project, which includes installing new cross‑drains and catch basins on Prater Road, excavating existing drainage laterals, installing flexible revetment, constructing a spoil bank, and performing associated water‑distribution work such as new water‑main installation and valve placement. The contract is a design‑build style with a bid bond of 5 % required, and the scope covers extensive temporary erosion control, traffic control, and full documentation of quality‑control testing.
• Install cross‑drain and catch basins, excavate and replace drainage laterals, and place flexible revetment (grout‑filled or approved alternate block mat).
• Install 12‑in. PVC water mains, insertion valves, and related fittings, with full hydrostatic testing and back‑filling.
• Provide temporary erosion‑control measures (sediment check dams, silt fencing, hay bales) and traffic signage; complete all required permits, SWPPP, and post‑construction documentation.
Attached files
Similar opportunities
Matched by Bid Banana AI™
Bid Banana · 1.6M+ bids and awards 🍌
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.